Total
(1306.3 Hours)
Empennage
(256.0 Hours)
-
08/11/06
Empennage Kit Arrived
-
09/15/20
Drilled Elevator Horns
(2.5 Hours)
-
09/11/21
Empennage Tips, Various Tasks
(4.0 Hours)
-
09/12/21
Empennage Tips
(3.3 Hours)
-
09/13/21
Empennage Tips
(1.6 Hours)
-
09/14/21
Empennage Tips
(1.3 Hours)
-
09/15/21
Empennage Tips
(1.0 Hours)
-
09/16/21
Empennage Tips
(2.0 Hours)
-
09/17/21
Empennage Tips
(0.8 Hours)
-
09/18/21
Empennage Tip Priming
(1.5 Hours)
-
09/19/21
Finished Empennage Tips (for now)
(1.0 Hours)
-
07/02/22
Canopy Molding Sanding, Paint Touchup, Cleaning; Started Empennage Fairing
(2.0 Hours)
-
07/03/22
Empennage Fairing Work
(3.2 Hours)
-
07/04/22
Empennage Fairing Layup
(2.1 Hours)
-
07/05/22
Empennage Fairing Sanding
(1.0 Hours)
-
08/07/22
Inside Parts Painting, Empennage Fairing Sanding
(1.4 Hours)
-
08/08/22
Interior Parts Painting, Empennage Fairing Sanding
(0.9 Hours)
-
08/15/22
Canopy Handle, Painting, Empennage Fairing Sanding
(1.0 Hours)
-
10/09/22
Empennage Fairing Cutting, Sanding, Epoxy
(1.5 Hours)
-
10/12/22
Empennage Fairing, Fuselage Painting
(0.5 Hours)
-
10/13/22
Empennage Fairing Sanding, Fitting
(2.0 Hours)
-
10/15/22
More Empennage Fairing
(3.9 Hours)
-
10/16/22
Continued Empennage Fairing Work
(2.0 Hours)
-
10/19/22
Empennage Fairing Micro Filling
(0.4 Hours)
-
10/20/22
Empennage Fairing, Prepping for Cabin Painting
(0.8 Hours)
-
10/21/22
Empennage Fairing Sanding
(0.6 Hours)
-
10/22/22
Empennage Fairing Painting, Cabin Painting, Rudder Lower Fairing
(0.5 Hours)
-
10/26/22
Sanding (Empennage Fairing and Rudder Lower Tip)
(0.6 Hours)
-
10/26/22
Sanding & Priming Empennage Fairing
(1.3 Hours)
-
10/29/22
Tail Light Bracket Mounting, Empennage Fairing Sanding
(0.6 Hours)
-
10/30/22
Empennage Fairing Sanding, Rudder Bottom Tip Riveting
(0.8 Hours)
-
11/01/22
Rudder Bottom Tip Sanding & Filling, Empennage Fairing Sanding
(0.7 Hours)
-
12/04/22
Empennage Fairing, Rudder Bottom Tip
(0.8 Hours)
Horizontal Stabilizer
(46.3 Hours)
Vertical Stabilizer
(18.5 Hours)
Rudder
(51.4 Hours)
-
09/17/06
VS & HS Riveting, Rudder Stiffeners
(3.0 Hours)
-
09/20/06
Rudder Stiffeners
(2.5 Hours)
-
09/22/06
Rudder Skins
(1.0 Hours)
-
09/25/06
Rudder Dimpling
(0.2 Hours)
-
10/01/06
Priming Stiffeners & HS Riveting
(1.5 Hours)
-
10/03/06
Rudder Stiffener Riveting
(1.2 Hours)
-
10/04/06
Finished Riveting Rudder Stiffeners
(0.5 Hours)
-
10/05/06
Rudder Skeleton
(2.0 Hours)
-
10/09/06
Rudder Work
(1.5 Hours)
-
10/12/06
Rudder Issues
-
10/16/06
Tech Counselor Visit
-
10/23/06
Rudder Work
(3.0 Hours)
-
10/24/06
Rudder Deburring
(1.5 Hours)
-
10/25/06
Rudder Prep
(1.0 Hours)
-
10/26/06
Rudder Prep
(4.0 Hours)
-
11/26/06
Shop Cleanup, Rudder Prep & Priming
(3.0 Hours)
-
11/27/06
Rudder Rivetting
(3.0 Hours)
-
11/28/06
Rudder Rivetting
(3.0 Hours)
-
12/07/06
Rudder
(1.5 Hours)
-
12/07/06
Rudder TE
(2.0 Hours)
-
12/14/06
Rudder TE Prep
(1.0 Hours)
-
12/17/06
Elevator Stiffers & Rudder Trailing Edge
(2.0 Hours)
-
08/08/08
Fuel Tank Rib Riveting, Rudder Rolling & Riveting, Leading Edge Riveting
(1.0 Hours)
-
10/10/08
Finished Rudder, Started Ailerons
(0.2 Hours)
-
10/22/22
Empennage Fairing Painting, Cabin Painting, Rudder Lower Fairing
(1.3 Hours)
-
10/23/22
Rudder Lower Fairing, Tail Light, Antenna Installation
(2.8 Hours)
-
10/29/22
Tail Light Bracket Mounting, Empennage Fairing Sanding
(0.5 Hours)
-
10/30/22
Empennage Fairing Sanding, Rudder Bottom Tip Riveting
(0.7 Hours)
-
11/01/22
Rudder Bottom Tip Sanding & Filling, Empennage Fairing Sanding
(0.7 Hours)
-
11/05/22
Rudder Bottom Tip Sanding & Filling, Tail Stiffener SL, Flap Position Sensor
(1.2 Hours)
-
11/13/22
Rudder Bottom Tip Sanding & Filling
(1.1 Hours)
-
11/26/22
Rudder Bottom Tip Sanding & Filling, Flap Position Sensor
(1.0 Hours)
-
11/27/22
Rudder Bottom Tip Sanding & Priming
(1.2 Hours)
-
12/04/22
Empennage Fairing, Rudder Bottom Tip
(0.8 Hours)
-
12/12/22
Finishing Rudder Tip, Reforming Wing Tip
(0.4 Hours)
Right Elevator
(39.1 Hours)
Left Elevator
(53.2 Hours)
-
12/17/06
Elevator Stiffers & Rudder Trailing Edge
(2.0 Hours)
-
01/03/07
Drilled Left Elevator
(2.0 Hours)
-
01/14/07
Left Elevator Trim Cutout Deburring
(1.5 Hours)
-
01/15/07
Left Elevator Dimpling
(3.0 Hours)
-
02/11/07
Right Elevator Completed!
(2.0 Hours)
-
02/12/07
Left Elevator Stiffener Riveting, Skeleton Drilling
(4.0 Hours)
-
02/13/07
Left Elevator Control Horn Problems
(0.5 Hours)
-
02/19/07
Left Elevator, Wing Main Spar Tie Downs
(0.5 Hours)
-
02/28/07
Left Elevator Drilling, Deburring
(3.0 Hours)
-
03/01/07
Left Elevator Deburring, Dimpling, Misc
(3.5 Hours)
-
03/02/07
Left Elevator C'Sinking, Priming
(2.5 Hours)
-
03/03/07
Left Elevator Tab Bending, Servo, Riveting
(4.5 Hours)
-
03/04/07
Left Elevator Riveting, Trim Tab Bending, Tank Rib Deburring
(3.8 Hours)
-
03/07/07
Trim Tab Bending, Drilling, Etc
(4.2 Hours)
-
03/08/07
Trim Tab Work (and Problems)
(2.0 Hours)
-
03/10/07
Trim Tab Riveting
(4.0 Hours)
-
03/11/07
Left Elevator Leading Edge Rolling, Wing Conduit Holes
(3.2 Hours)
-
08/28/21
Fiberglass Elevator Tip Installation
(2.0 Hours)
-
09/04/21
Elevator & HS tips
(1.5 Hours)
-
09/05/21
Elevator tips sanding & priming
(0.5 Hours)
-
09/08/21
HS Tip Reinforcement, Elevator Tip Touchup
(0.1 Hours)
-
09/09/21
HS Tip, Elevator Tip Sanding, Filling
(0.5 Hours)
-
09/20/21
Elevator Trim, Aileron Trim
(2.5 Hours)
Wings
(377.9 Hours)
-
11/16/06
Wings Arrive
-
11/21/06
Wing Parts Cleanup
-
02/14/07
Wing Main Spar Countersinking
(3.5 Hours)
-
02/15/07
Wing Spar Countersinking, Nutplates
(4.5 Hours)
-
02/18/07
Wing Countersinking, Misc
(7.5 Hours)
-
02/19/07
Left Elevator, Wing Main Spar Tie Downs
(5.5 Hours)
-
02/20/07
Wing Rear Spar Prep, Misc
(4.5 Hours)
-
02/21/07
Wing Rear Spar Prep
(4.5 Hours)
-
02/22/07
Wing Rear Spar Prep
(3.0 Hours)
-
02/23/07
Finished Rear Wing Spar Prep
(3.5 Hours)
-
02/25/07
Wing Rib Deburring
(8.0 Hours)
-
02/26/07
Wing Leading Edge Rib Deburring
(2.0 Hours)
-
02/27/07
Wing Leading Edge / Tank Rib Deburring
(4.0 Hours)
-
03/04/07
Left Elevator Riveting, Trim Tab Bending, Tank Rib Deburring
(0.7 Hours)
-
03/05/07
Wing Rib Deburring, Flanging
(4.0 Hours)
-
03/06/07
Wing Rib Flanging and Fluting
(4.2 Hours)
-
03/11/07
Left Elevator Leading Edge Rolling, Wing Conduit Holes
(2.7 Hours)
-
03/13/07
Stored HS, Drilled Pitot/AOA Line Holes
(0.5 Hours)
-
03/14/07
Right Wing Spar/Rib Drilling, Deburring
(4.0 Hours)
-
03/15/07
Left Wing Drilling, Tapped Tie Downs
(3.0 Hours)
-
03/16/07
Wing Rib Priming Prep
(4.5 Hours)
-
03/17/07
Wing Rib Cleaning
(2.2 Hours)
-
03/18/07
Wing Jig Construction, Rib Priming
(1.5 Hours)
-
03/20/07
Wing Jig
-
03/21/07
Right Wing Riveting
(2.5 Hours)
-
03/22/07
Riveted Right Wing Rear Spar
(2.0 Hours)
-
03/23/07
Wing Jig Work
-
03/24/07
Wing Jig, Drilling
(5.0 Hours)
-
03/25/07
More Wing Assembly, Drilling
(3.8 Hours)
-
03/10/08
Wing Reconstruction
-
04/04/08
Left Leading Edge Prep & Fuel Tank Sealing
(2.7 Hours)
-
04/06/08
Fuel Tank Misc
(0.5 Hours)
-
04/12/08
Fuel Tank Leak Testing & Wing Prep
(2.4 Hours)
-
04/13/08
Wing Prep
(4.8 Hours)
-
04/14/08
Leading Edge Riveting
(1.8 Hours)
-
04/15/08
Leading Edge Riveting
(1.0 Hours)
-
04/17/08
Leading Edge
(2.0 Hours)
-
04/18/08
Landing Light
(0.8 Hours)
-
04/20/08
Landing Light
(4.8 Hours)
-
04/22/08
Landing Light/Leading Edge
(1.4 Hours)
-
04/26/08
Leading Edge
(2.0 Hours)
-
04/27/08
Riveted Leading Edge, Misc
(4.8 Hours)
-
05/03/08
Fuel Tank Fit, Scarf Joint
(0.4 Hours)
-
05/05/08
Top Wing Skin Prep
(0.8 Hours)
-
05/07/08
Wing Misc
(1.5 Hours)
-
06/05/08
Wing Misc
(0.8 Hours)
-
06/15/08
Wing Skin Riveting
(1.2 Hours)
-
06/16/08
Wing Skin Riveting
(1.5 Hours)
-
06/17/08
Aileron Stiffeners, Wing Skin Riveting
(1.2 Hours)
-
06/18/08
Aileron Stiffener Shaping, Finished Top Right Wing Skin Riveting
(1.2 Hours)
-
06/24/08
Built Wing Cradle
-
06/27/08
Left Wing Skeleton Prep
(2.2 Hours)
-
06/28/08
Wing Potpourri
(5.8 Hours)
-
06/29/08
Right Wing Aileron Gap Faring, Flap Brace, Skin Prep
(8.5 Hours)
-
07/07/08
Left Wing Drilling
(2.7 Hours)
-
07/08/08
Left Wing Drilling
(3.0 Hours)
-
07/26/08
Wing Misc
(1.0 Hours)
-
08/06/08
Left Leading Edge Prep
(1.0 Hours)
-
08/08/08
Fuel Tank Rib Riveting, Rudder Rolling & Riveting, Leading Edge Riveting
(4.5 Hours)
-
08/09/08
Left Landing Light
(2.0 Hours)
-
08/10/08
Attached Left Leading Edge To Wing
(2.0 Hours)
-
10/01/08
Leading Edge Riveting, Wing Skeleton Prep
(2.0 Hours)
-
10/02/08
Left Wing Prep
(3.9 Hours)
-
10/03/08
More Wing Prep
(2.2 Hours)
-
10/04/08
More Wing Prep, Fuel Tank Misc
(1.0 Hours)
-
10/05/08
Fuel Tank Misc, Began Aileron Pushrods
(4.2 Hours)
-
10/13/08
Fuse Ordered, Finished Fuel Tank, Wing Prep, Pushrods
(3.0 Hours)
-
10/22/08
Fuel Tank Testing, Pushrods
(0.5 Hours)
-
10/22/08
Tank Testing, Aileron Pushrods, Top Skin Riveting
(1.7 Hours)
-
10/23/08
Fuel Tank De-Leaking, Misc
(0.2 Hours)
-
10/26/08
Pushrods, Finished Left Wing Top Skin Riveting, Demolished Wing Jig
(5.0 Hours)
-
10/27/08
Left Wing Aileron Brackets, Flap Brace, Aileron Gap Fairing
(4.5 Hours)
-
11/02/08
Installed Left Wing Conduit
(0.8 Hours)
-
06/13/10
Began right wing bottom skin riveting...
(3.0 Hours)
-
08/22/10
More Right Wing Bottom Skin Riveting
(2.5 Hours)
-
08/24/10
Finished Riveting Bottom Skins on Right Wing
(2.5 Hours)
-
08/11/12
Left Wing Bottom Skin Riveting
(3.0 Hours)
-
08/18/12
More Left Wing Bottom Skin Riveting
(2.2 Hours)
-
08/19/12
Finished Bottom Skin Riveting
(0.5 Hours)
-
05/30/20
Removed L Wing, Installed Nutplates
(3.0 Hours)
-
05/31/20
Pitot Mast, Right Wing Platenuts
(4.0 Hours)
-
06/12/20
Finished R Wing, Rearranged Garage
(0.5 Hours)
-
10/03/21
New Landing Lights, New Pitot Tube Mount
(4.5 Hours)
-
10/30/21
Left Wing Landing Light Lens, Misc
(1.5 Hours)
-
12/24/22
Built New Wing Cradle
-
12/26/22
Various Left Wing Tasks
(1.0 Hours)
Fuel Tanks
(89.7 Hours)
-
03/26/07
Fuel Tank Assembly
(0.8 Hours)
-
03/29/07
Fuel Tank Assembly
(0.3 Hours)
-
03/30/07
Drilled Z-brackets for Right Fuel Tank
(2.5 Hours)
-
04/01/07
Fuel Tank Stuff
(2.5 Hours)
-
03/12/08
Fuel Tank Stiffener Fabrication
(1.2 Hours)
-
03/12/08
Fuel Tank Drilling
(0.8 Hours)
-
03/13/08
Fuel Tank Stuff
(4.2 Hours)
-
03/14/08
Fuel Tank Details
(4.2 Hours)
-
03/16/08
Capacitive Fuel Probes
(0.5 Hours)
-
03/19/08
Fuel Tank Cap & Drain
(1.2 Hours)
-
03/23/08
Fuel Tank Prep
(6.0 Hours)
-
03/24/08
More Fuel Tank Prep
(0.7 Hours)
-
04/01/08
Fuel Tank Preparation
(1.5 Hours)
-
04/02/08
Fuel Tank Sealing
(4.7 Hours)
-
04/03/08
Fuel Tank Rib Sealing
(1.5 Hours)
-
04/04/08
Left Leading Edge Prep & Fuel Tank Sealing
(3.8 Hours)
-
04/05/08
Fuel Tank Misc
(1.5 Hours)
-
04/06/08
Fuel Tank Misc
(4.0 Hours)
-
04/09/08
Fuel Tank Sealing
(2.8 Hours)
-
04/10/08
Fuel Tank Sealing
(4.6 Hours)
-
04/11/08
Finished Sealing Tank
(6.8 Hours)
-
04/12/08
Fuel Tank Leak Testing & Wing Prep
(0.3 Hours)
-
04/13/08
Wing Prep
(0.2 Hours)
-
04/14/08
Leading Edge Riveting
(0.2 Hours)
-
05/03/08
Fuel Tank Fit, Scarf Joint
(0.3 Hours)
-
07/11/08
Z-Bracket Drilling
(1.8 Hours)
-
07/12/08
Fuel Tank Drilling, Prep
(7.5 Hours)
-
07/13/08
Fuel Tank Prep, Riveting/Sealing
(6.0 Hours)
-
07/15/08
Riveted First Left Fuel Tank Rib
(1.6 Hours)
-
07/20/08
Left Fuel Tank Rib Riveting
(2.0 Hours)
-
07/27/08
Left Fuel Tank Joint Plate Prep
(0.5 Hours)
-
08/08/08
Fuel Tank Rib Riveting, Rudder Rolling & Riveting, Leading Edge Riveting
(2.0 Hours)
-
10/04/08
More Wing Prep, Fuel Tank Misc
(1.8 Hours)
-
10/08/08
Riveting Inboard Fuel Tank Rib, Misc
(2.0 Hours)
-
10/11/08
Aileron Construction, Fuel Tank Misc
(2.0 Hours)
-
10/12/08
Finished Both Ailerons
(0.5 Hours)
-
10/13/08
Fuse Ordered, Finished Fuel Tank, Wing Prep, Pushrods
(4.0 Hours)
-
10/22/08
Fuel Tank Testing, Pushrods
(0.2 Hours)
-
10/22/08
Tank Testing, Aileron Pushrods, Top Skin Riveting
(0.2 Hours)
-
10/23/08
Fuel Tank De-Leaking, Misc
(0.3 Hours)
Ailerons
(27.4 Hours)
-
06/17/08
Aileron Stiffeners, Wing Skin Riveting
(0.5 Hours)
-
06/18/08
Aileron Stiffener Shaping, Finished Top Right Wing Skin Riveting
(0.8 Hours)
-
06/20/08
Aileron Stiffener Drilling, Deburring
(1.0 Hours)
-
06/22/08
Aileron Deburring, Priming, Dimpling
(2.5 Hours)
-
06/23/08
Riveted Aileron Stiffeners
(1.8 Hours)
-
06/25/08
Aileron Bending, Skeleton Drilling
(1.5 Hours)
-
06/26/08
Aileron Spars Deburring, Priming
(2.0 Hours)
-
06/28/08
Wing Potpourri
(0.8 Hours)
-
07/07/08
Left Wing Drilling
(0.2 Hours)
-
07/19/08
Aileron Misc
(0.8 Hours)
-
10/05/08
Fuel Tank Misc, Began Aileron Pushrods
(1.0 Hours)
-
10/10/08
Finished Rudder, Started Ailerons
(0.8 Hours)
-
10/11/08
Aileron Construction, Fuel Tank Misc
(8.0 Hours)
-
10/12/08
Finished Both Ailerons
(6.0 Hours)
Flaps
(22.5 Hours)
Wing Tips
(20.1 Hours)
Fuselage
(512.4 Hours)
-
10/13/08
Fuse Ordered, Finished Fuel Tank, Wing Prep, Pushrods
-
12/12/08
Fuselage Arrives, Begin Firewall
-
12/19/09
Various Fuselage Prep Tasks
(7.6 Hours)
-
12/20/09
Primed Longerons, Started Fuselage Reassembly
(5.5 Hours)
-
12/25/09
More Solo Fuselage Riveting
(1.2 Hours)
-
12/31/09
More Fuselage Riveting
(0.7 Hours)
-
01/01/10
Even More.... Fuselage Riveting!
(1.4 Hours)
-
03/14/10
More Fuselage Riveting
(1.4 Hours)
-
04/11/10
More Fuselage Riveting
(1.0 Hours)
-
04/17/10
Fuselage Riveting
(2.7 Hours)
-
04/18/10
Flipped the Fuselage!
(4.8 Hours)
-
04/25/10
Seat Belt Anchors, F-706 Bulkhead, Bellcrank, F-706/705 Gussets
(5.3 Hours)
-
04/26/10
Fitted Aft and Forward Top Skins
(2.3 Hours)
-
05/01/10
Various Fuselage Tasks
(1.6 Hours)
-
05/02/10
Deburred, Dimpled Top Fuse Skins, Started on Baggage Skins
(7.4 Hours)
-
05/23/10
Seat Hinge Pins, Forward Tunnel Cover
(1.9 Hours)
-
05/29/10
More Forward Fuselage Covers, Started Electric Flap System
(5.7 Hours)
-
05/31/10
Continued Flap Subsystem...
(2.8 Hours)
-
09/20/20
Seatbacks, Electric Flap Assembly, Misc Riveting
(2.0 Hours)
-
09/24/21
Misc. Priming & Riveting, Installed Static Ports
(4.0 Hours)
-
09/25/21
Static Line Routing, Wiring Holes in F-706, Reinstalled Control Pushrod, Installed Brake Reservoir
(6.0 Hours)
-
09/27/21
Bolted Rudder Pedals, Installed Brake Lines, Aft Inspection Plate Covers
(3.0 Hours)
-
07/02/22
Canopy Molding Sanding, Paint Touchup, Cleaning; Started Empennage Fairing
(0.8 Hours)
-
11/28/22
Finished Flap Sensor, Seatback Interference
(1.1 Hours)
Firewall
(22.4 Hours)
Bulkheads
(43.0 Hours)
-
12/15/08
Finished Firewall, Started F-704 Bulkhead
(1.2 Hours)
-
12/16/08
Continued F-704 Bulkhead Work
(3.0 Hours)
-
12/17/08
Bolted Control Column to F-704
(0.5 Hours)
-
12/19/08
F-704 Control Column, Nutplates
(1.0 Hours)
-
12/20/08
Finished F-704 Bulkheads, Started F-705
(7.2 Hours)
-
12/21/08
F-705 Bulkhead Drilling
(2.0 Hours)
-
12/25/08
More F-705: Drilled Seatbelt Anchors
(1.3 Hours)
-
12/27/08
F-705, F-706 Bulkhead Work
(1.7 Hours)
-
12/28/08
F-706 Bulkhead Work
(2.8 Hours)
-
01/01/09
More F-706 Fiddling
(0.8 Hours)
-
01/04/09
F-707 Bulkhead
(1.3 Hours)
-
01/19/09
F-707 and F-708 Bulkheads
(2.5 Hours)
-
01/20/09
F-707/8 Riveting, F-706 Drilling
(2.0 Hours)
-
06/01/09
Worked on F-706 Bulkhead
(0.8 Hours)
-
06/02/09
Finished Riveting F-706 Bulkhead
(0.8 Hours)
-
06/06/09
F-705 Bulkhead Drilling, Deburring, Riveting
(3.0 Hours)
-
06/07/09
More F-705 Bulkhead Drilling and Riveting
(2.9 Hours)
-
06/08/09
F-705 Prep & Prime, F-709, F-710
(2.0 Hours)
-
06/11/09
More F-705, F-711 Misc
(0.5 Hours)
-
06/14/09
Finished F-710, F-705; Started F-711
(3.8 Hours)
-
06/14/09
Finished F-711, F-712; Started Longerons
(2.0 Hours)
Longerons
(9.8 Hours)
Aft Fuselage
(77.1 Hours)
-
06/21/09
Longeron Bending, Part 3
(0.5 Hours)
-
06/22/09
More Aft Fuselage
(1.2 Hours)
-
06/23/09
More Aft Bottom Skin / Tail Spring
(0.8 Hours)
-
06/28/09
Cleco'd Aft Fuselage, Started Drilling
(6.7 Hours)
-
07/03/09
Aft Fuselage Drilling, Deburring, Deblueing
(7.9 Hours)
-
07/04/09
Aft Fuselage Deburring, Dimpling
(2.8 Hours)
-
07/05/09
Aft Fuselage Dimpling & Priming
(4.1 Hours)
-
07/06/09
Aft Fuselage Riveting
(1.5 Hours)
-
07/10/09
Cleco'd Aft Fuselage, Started Center Fuselage Tasks
(0.5 Hours)
-
11/03/09
Began Riveting Aft Fuselage
(0.8 Hours)
-
11/25/09
Riveting Aft Fuselage
(3.2 Hours)
-
11/26/09
Finished Aft Fuse Riveting, Mated Center Section
(1.8 Hours)
-
11/27/09
Rolled F-770 Side Skins, Drilled Longerons, Started Fitting Firewall
(1.0 Hours)
-
04/19/10
Aft Deck Prep
(1.2 Hours)
-
04/20/10
Riveted Aft Deck, Started on Side Rails and Gusset
(1.3 Hours)
-
09/17/20
Mounting Horizontal Stabilizer to the Aft Fuselage
(4.2 Hours)
-
09/18/20
Elevator Bellcrank, Pushrods
(3.0 Hours)
-
09/19/20
Elevator Up Stop, Vertical Stabilizer Fitting, Hung Rudder
(7.0 Hours)
-
09/26/20
Rudder Stops, Misc Priming
(3.8 Hours)
-
09/27/20
Left Elevator Control Horn Doubler, Misc
(3.0 Hours)
-
10/12/21
ELT Tray Installation
(1.5 Hours)
-
05/03/22
Misc Aft Fuselage Installs, Aft Fuselage Top Skin Riveting
(5.6 Hours)
-
05/04/22
Aft Top Skin Riveting
(5.0 Hours)
-
05/07/22
Misc Riveting, Wheels, Canopy Assembly
(0.7 Hours)
-
11/05/22
Rudder Bottom Tip Sanding & Filling, Tail Stiffener SL, Flap Position Sensor
(0.8 Hours)
-
12/05/22
Damaged and Removed F-712 aft bulkhead, Riveted sub panel
(1.5 Hours)
-
12/20/22
Aft Fuselage Bulkhead Repair
(3.1 Hours)
-
12/21/22
Aft Fuselage Bulkhead Repair
(2.7 Hours)
Center Fuselage
(113.0 Hours)
-
07/10/09
Cleco'd Aft Fuselage, Started Center Fuselage Tasks
(1.8 Hours)
-
07/11/09
Center Fuselage Fabricating, Drilling
(7.0 Hours)
-
07/12/09
Center Fuse Drilling
(1.6 Hours)
-
07/27/09
Started installing crotch strap brackets
(2.0 Hours)
-
08/30/09
Drilled second crotch strap bracket
(1.1 Hours)
-
09/27/09
Deburred & Primed Seat Ribs
(4.1 Hours)
-
09/29/09
Assembling the Center Section
(3.0 Hours)
-
09/30/09
Finished Riveting Seat Ribs to F-704B, Prepped Baggage Ribs
(1.7 Hours)
-
10/01/09
Finished prepping baggage area ribs
(1.0 Hours)
-
10/11/09
Center Fuse Riveting & Skin Prep
(4.6 Hours)
-
10/18/09
Riveting Center Fuselage Bottom Skin
(1.0 Hours)
-
10/24/09
Finished Riveting Center Fuselage Bottom Skin
(0.8 Hours)
-
11/01/09
Drilling Baggage Area Floor & Seat Pans, Drilling F-715 Ribs
(1.7 Hours)
-
11/04/09
Finished Drilling F-715 Seat Ribs
(1.2 Hours)
-
11/26/09
Finished Aft Fuse Riveting, Mated Center Section
(1.8 Hours)
-
11/27/09
Rolled F-770 Side Skins, Drilled Longerons, Started Fitting Firewall
(2.5 Hours)
-
12/06/09
Finished Rudder Pedal Drilling, Drilled Floor Stiffeners, Drilled Baggage Side Skeleton
(1.9 Hours)
-
12/08/09
Misc. Fuselage Drilling
(0.8 Hours)
-
12/16/09
Deburring Center Section, F-715 ribs, etc...
(1.8 Hours)
-
12/22/09
Fuselage Riveting
(1.7 Hours)
-
04/20/10
Riveted Aft Deck, Started on Side Rails and Gusset
(1.8 Hours)
-
04/22/10
More side rails and gussets...
(1.1 Hours)
-
05/03/10
Baggage Skins, Seatbelt Anchors
(2.8 Hours)
-
05/04/10
Seatbelt Anchors, Baggage Bulkhead
(1.9 Hours)
-
05/05/10
Baggage Bulkhead Covers
(3.0 Hours)
-
05/06/10
Finishing Baggage Bulkhead Cover
(2.5 Hours)
-
05/08/10
Baggage Tunnel Cover, Baggage Side Skins, Seat Pans
(2.6 Hours)
-
05/09/10
Aft Seat Pans, Forward Tunnel Cover
(5.3 Hours)
-
05/16/10
Seat Floors and Backs
(5.6 Hours)
-
05/22/10
More Seat Fabrication
(5.0 Hours)
-
05/30/10
More Electric Flap System
(2.0 Hours)
-
06/02/10
Flap Subsystem Drilling and Fitting
(1.3 Hours)
-
06/05/10
Finished up the flap stuff...mostly.
(1.6 Hours)
-
04/03/21
Crotch Strap Brackets
(3.0 Hours)
-
04/04/21
Side Channel Covers, Cabin Frame Roll Bar
(1.0 Hours)
-
09/20/21
Elevator Trim, Aileron Trim
(1.0 Hours)
-
09/23/21
Aileron Trim Install
(3.0 Hours)
-
10/02/21
Stick Boot Rings
(1.8 Hours)
-
10/07/21
Left Wingtip, Stick Boot Rings
(0.2 Hours)
-
10/17/21
Boost Pump Kit
(2.5 Hours)
-
10/23/21
Primed Boost Pump Cover, Prosealed NACA Ducts
(2.2 Hours)
-
10/24/21
Finished Boost Pump Enclosure, Plumbing
(4.5 Hours)
-
11/05/21
Installed Center Tunnel Fuel Line, Plus Some Prosealing
(2.5 Hours)
-
05/05/22
Canopy Deck Riveting, Finished Canopy Frame Riveting, Canopy Struts
(3.0 Hours)
-
05/06/22
Canopy Frame Painting, Misc Fuselage Riveting, Installed Gear Legs, Started on Wheels
(0.5 Hours)
-
05/21/22
Misc Riveting, Wheels Installed
(1.0 Hours)
-
10/12/22
Empennage Fairing, Fuselage Painting
(2.0 Hours)
-
10/20/22
Empennage Fairing, Prepping for Cabin Painting
(1.1 Hours)
-
10/22/22
Empennage Fairing Painting, Cabin Painting, Rudder Lower Fairing
(1.5 Hours)
-
10/23/22
Rudder Lower Fairing, Tail Light, Antenna Installation
(0.9 Hours)
-
11/05/22
Rudder Bottom Tip Sanding & Filling, Tail Stiffener SL, Flap Position Sensor
(0.7 Hours)
-
12/16/22
Wing Tip Forming, Seat Back Brace Re-do
(1.2 Hours)
Forward Fuselage
(53.5 Hours)
-
11/27/09
Rolled F-770 Side Skins, Drilled Longerons, Started Fitting Firewall
(3.0 Hours)
-
11/28/09
Drilled Firewall to side skins
(1.2 Hours)
-
11/29/09
Forward Fuselage Longeron Drilling
(5.1 Hours)
-
11/30/09
Forward Fuse Longerons and Gussets
(2.8 Hours)
-
12/01/09
Drilled F-7101 and F-902
(1.7 Hours)
-
12/02/09
Fabricated and Drilled F-796A, B, C, and D
(2.5 Hours)
-
12/03/09
More Forward Bottom Skin Drilling, Started Brake Pedals
(1.5 Hours)
-
12/05/09
Brake/Rudder Pedal Assembly
(5.2 Hours)
-
12/06/09
Finished Rudder Pedal Drilling, Drilled Floor Stiffeners, Drilled Baggage Side Skeleton
(3.1 Hours)
-
12/08/09
Misc. Fuselage Drilling
(0.8 Hours)
-
12/12/09
Drilling, Disassembly, Countersinking, Deburring
(4.0 Hours)
-
12/13/09
Endless Deburring, Dimpling, and Priming
(8.9 Hours)
-
12/15/09
More Deburring, Countersinking, Disassembly
(1.8 Hours)
-
12/21/09
Forward Fuselage Riveting, Misc...
(2.8 Hours)
-
12/23/09
Fuselage Riveting
(1.5 Hours)
-
04/23/10
Canopy Deck Drilling, Firewall Gusset
(2.2 Hours)
-
04/24/10
Drilled and Riveted Firewall/Longeron Gussets
(1.8 Hours)
-
05/26/10
Fuel Valve Plate & Cover
(0.5 Hours)
-
05/28/10
Drilled F-782C Center Cabin Cover, Fab'd F-782D Angles, Drilled F-7114-R Gusset
(1.9 Hours)
-
12/05/22
Damaged and Removed F-712 aft bulkhead, Riveted sub panel
(1.5 Hours)
Mating Wings
(44.8 Hours)
Cabin Frame
(28.9 Hours)
Forward Deck
(24.1 Hours)
Interior Painting
(25.6 Hours)
Finishing
(160.1 Hours)
Canopy
(140.9 Hours)
-
12/31/21
Canopy Hinges, Latch
(5.0 Hours)
-
01/02/22
Canopy Latch Mechanism
(4.0 Hours)
-
01/03/22
Canopy Frame Prep, Drilling, Fitting
(7.0 Hours)
-
01/04/22
Canopy Frame Drilling
(5.4 Hours)
-
01/06/22
Canopy Fitting
(2.2 Hours)
-
01/07/22
Canopy Frame Fitting & Drilling
(5.0 Hours)
-
01/08/22
Canopy Frame Drilling, Riveting
(4.3 Hours)
-
01/09/22
Canopy Reinforcement Fitting & Drilling
(2.5 Hours)
-
01/10/22
Canopy Braces/Struts
(3.3 Hours)
-
01/11/22
Canopy Forward Skin Shrinking
(1.5 Hours)
-
01/12/22
Canopy Misc
(2.0 Hours)
-
01/13/22
Canopy Misc
(1.0 Hours)
-
01/17/22
Canopy Misc, Engine Mount Drilling
(0.5 Hours)
-
02/19/22
More Canopy Front Deck Fitting
(2.5 Hours)
-
02/26/22
Started Canopy Trimming
(3.5 Hours)
-
02/27/22
Canopy Fitting
(2.5 Hours)
-
02/28/22
Made the Big Canopy Cut, More Fitting
(2.5 Hours)
-
03/01/22
Canopy Fitting
(1.8 Hours)
-
03/12/22
Canopy Drilling
(5.2 Hours)
-
03/13/22
Canopy Countersinking, Drilling, Fitting
(6.0 Hours)
-
03/14/22
Tapped Rollbar Holes, Trimmed Aft Window
(1.2 Hours)
-
03/20/22
Rear Window Countersinking, Fabbing Backing Strip
(2.8 Hours)
-
03/24/22
Canopy Backing Strip, Trimming, Adjusting
(4.4 Hours)
-
03/26/22
Canopy Side Skirt Fitting
(2.7 Hours)
-
03/27/22
More Side Skirts
(2.0 Hours)
-
03/30/22
Gas Strut Mounts
(1.7 Hours)
-
03/31/22
Canopy Frame Prepping
(1.2 Hours)
-
04/02/22
Canopy Frame Prepping
(2.0 Hours)
-
04/07/22
Canopy Misc
(1.5 Hours)
-
04/10/22
Canopy Frame Priming and Riveting
(4.1 Hours)
-
05/05/22
Canopy Deck Riveting, Finished Canopy Frame Riveting, Canopy Struts
(3.0 Hours)
-
05/06/22
Canopy Frame Painting, Misc Fuselage Riveting, Installed Gear Legs, Started on Wheels
(2.9 Hours)
-
05/07/22
Misc Riveting, Wheels, Canopy Assembly
(1.8 Hours)
-
05/08/22
Canopy Latch Lugs, Fit
(4.4 Hours)
-
05/22/22
Canopy Handle, Fit
(2.2 Hours)
-
05/29/22
Canopy Fit
(0.9 Hours)
-
05/30/22
Canopy Fit
(3.2 Hours)
-
06/04/22
Canopy Fit, Aft Window Backing Strips
(4.5 Hours)
-
06/05/22
Front Canopy Molding
(2.8 Hours)
-
06/06/22
Canopy Molding
(0.6 Hours)
-
06/11/22
Laid Up the Front Canopy Molding
(3.5 Hours)
-
06/13/22
Canopy Molding Sanding
(2.7 Hours)
-
06/14/22
Canopy Molding Sanding
(3.1 Hours)
-
06/15/22
Canopy Molding Sanding/Filling
(2.0 Hours)
-
06/16/22
Canopy Molding Sanding/Filling
(2.4 Hours)
-
06/19/22
Canopy Molding Sanding/Priming
(1.3 Hours)
-
06/21/22
Canopy Molding Sanding/Painting
(1.2 Hours)
-
06/23/22
Canopy Molding Sanding/Touchup
(0.7 Hours)
-
07/02/22
Canopy Molding Sanding, Paint Touchup, Cleaning; Started Empennage Fairing
(2.2 Hours)
-
07/16/22
Canopy Repainting
(1.5 Hours)
-
07/30/22
Canopy Fans
(1.9 Hours)
-
08/14/22
Panel Fans, Painting
(0.5 Hours)
-
08/15/22
Canopy Handle, Painting, Empennage Fairing Sanding
(0.2 Hours)
Firewall Forward
(3.3 Hours)
Landing Gear
(9.8 Hours)
Electrical
(6.0 Hours)
Miscellaneous
|