Date *Time Summary
04/18/24   Wheel Pant Sanding, Fiberglass
04/17/24   Wheel Pant Bracket Riveting
04/16/24   Autopilot Roll Servo Mount, VA-168 Manifold Misc, Wheel Fairing Stuff
04/15/24   Cowl Attach Hinges, Wheel Pants
04/14/24   Cowl Hinges
04/11/24   Wheel Pant Sanding/Reinforcement, Firewall to Cowling Attach
04/10/24   Right Wheel Fairing
04/09/24   Left Wheel Pant
04/08/24   Left Wheel Pant
04/07/24   Right Wheel Fairing
04/06/24   Left Wheel Fairing
04/05/24   Left Wheel Fairing
04/04/24   Nav Lights, Copper Bar, Wheel Fairings
03/02/24   Gear Pant Centerlines, Misc
02/11/24 0.7 Hours Landing Gear Fairings
02/10/24 1.2 Hours Landing Gear Fairings
02/08/24 1.3 Hours Landing Gear Fairings
02/05/24 3.5 Hours Landing Gear Fairings
02/04/24 2.7 Hours Landing Gear Leg Fairings
02/03/24 5.0 Hours Landing Gear Leg Fairings
02/02/24 5.2 Hours Landing Gear and Leg Fairings, Brakes and Lines
12/21/23 1.8 Hours Firewall Forward Misc
12/10/23 2.9 Hours Firewall Forward Misc
10/27/23 1.8 Hours Cockpit Fit Testing, Panel Planning, Left Seatback Modification
10/03/23 0.3 Hours Right Wing Tip Done!
10/01/23 0.5 Hours Right Wing Tip Sanding, Priming
09/28/23 0.8 Hours Right Wing Tip Sanding, Priming
09/26/23 1.3 Hours Right Wing Tip Sanding, Filling
09/24/23 0.7 Hours Right Wing Tip Sanding, Priming
09/23/23 0.3 Hours Right Wing Tip Sanding, Filling
09/17/23 0.5 Hours Right Wing Tip Sanding, Filling
09/10/23 0.8 Hours Right Wing Tip Sanding, Filling
09/09/23 1.0 Hours Right Wing Tip Lens Screws, Tip Filling
09/03/23 0.5 Hours Right Wing Tip Lens Trimming, Prep
08/28/23 0.7 Hours Right Wing Tip Lens Trimming
08/27/23 0.5 Hours Right Wing Tip Lens Trimming
08/26/23 2.5 Hours R Wing Tib Rib, Lens
08/20/23 1.8 Hours Right Wing Tip Nutplates, Countersinking
08/12/23 2.5 Hours Left Wing Tip Sanding, Right Wing Tip Drilling
08/11/23 0.3 Hours Right Wing Tip Prep
08/10/23 5.2 Hours Left Wing Tip Sanding/Priming, Started Right Wing Tip
08/08/23 5.0 Hours Horizontal Stabilizer Reinforcement Plates, Left Wing Tip Sanding/Painting
08/06/23 1.7 Hours Finished New Right Seat Brace, Left Wing Tip Sanding, Priming
08/05/23 2.0 Hours More Wing Tip Sanding/Filling, New Right Seat Back Brace
02/21/23 0.9 Hours Left Wing Tip Filling/Sanding
02/20/23 1.0 Hours Wing Tip Filling and Sanding
12/26/22 3.6 Hours Various Left Wing Tasks
12/24/22   Built New Wing Cradle
12/21/22 2.7 Hours Aft Fuselage Bulkhead Repair
12/20/22 3.1 Hours Aft Fuselage Bulkhead Repair
12/16/22 2.0 Hours Wing Tip Forming, Seat Back Brace Re-do
12/13/22 0.5 Hours Worked on Wing Tip Deformation
12/12/22 1.0 Hours Finishing Rudder Tip, Reforming Wing Tip
12/05/22 3.0 Hours Damaged and Removed F-712 aft bulkhead, Riveted sub panel
12/04/22 1.5 Hours Empennage Fairing, Rudder Bottom Tip
11/28/22 2.1 Hours Finished Flap Sensor, Seatback Interference
11/27/22 1.2 Hours Rudder Bottom Tip Sanding & Priming
11/26/22 3.2 Hours Rudder Bottom Tip Sanding & Filling, Flap Position Sensor
11/13/22 1.1 Hours Rudder Bottom Tip Sanding & Filling
11/05/22 2.8 Hours Rudder Bottom Tip Sanding & Filling, Tail Stiffener SL, Flap Position Sensor
11/01/22 1.5 Hours Rudder Bottom Tip Sanding & Filling, Empennage Fairing Sanding
10/30/22 1.4 Hours Empennage Fairing Sanding, Rudder Bottom Tip Riveting
10/29/22 1.1 Hours Tail Light Bracket Mounting, Empennage Fairing Sanding
10/26/22 1.3 Hours Sanding & Priming Empennage Fairing
10/26/22 0.6 Hours Sanding (Empennage Fairing and Rudder Lower Tip)
10/23/22 6.5 Hours Rudder Lower Fairing, Tail Light, Antenna Installation
10/22/22 3.3 Hours Empennage Fairing Painting, Cabin Painting, Rudder Lower Fairing
10/21/22 0.6 Hours Empennage Fairing Sanding
10/20/22 1.9 Hours Empennage Fairing, Prepping for Cabin Painting
10/19/22 0.4 Hours Empennage Fairing Micro Filling
10/16/22 2.0 Hours Continued Empennage Fairing Work
10/15/22 3.9 Hours More Empennage Fairing
10/13/22 2.0 Hours Empennage Fairing Sanding, Fitting
10/12/22 2.5 Hours Empennage Fairing, Fuselage Painting
10/09/22 1.5 Hours Empennage Fairing Cutting, Sanding, Epoxy
08/15/22 1.4 Hours Canopy Handle, Painting, Empennage Fairing Sanding
08/14/22 1.4 Hours Panel Fans, Painting
08/08/22 1.5 Hours Interior Parts Painting, Empennage Fairing Sanding
08/07/22 2.3 Hours Inside Parts Painting, Empennage Fairing Sanding
07/31/22 4.2 Hours Paint Stripping
07/30/22 1.9 Hours Canopy Fans
07/17/22 2.0 Hours Paint Stripping
07/16/22 1.5 Hours Canopy Repainting
07/05/22 1.0 Hours Empennage Fairing Sanding
07/04/22 2.1 Hours Empennage Fairing Layup
07/03/22 3.2 Hours Empennage Fairing Work
07/02/22 5.1 Hours Canopy Molding Sanding, Paint Touchup, Cleaning; Started Empennage Fairing
06/23/22 0.7 Hours Canopy Molding Sanding/Touchup
06/21/22 1.2 Hours Canopy Molding Sanding/Painting
06/19/22 1.3 Hours Canopy Molding Sanding/Priming
06/16/22 2.4 Hours Canopy Molding Sanding/Filling
06/15/22 2.0 Hours Canopy Molding Sanding/Filling
06/14/22 3.1 Hours Canopy Molding Sanding
06/13/22 2.7 Hours Canopy Molding Sanding
06/11/22 3.5 Hours Laid Up the Front Canopy Molding
06/06/22 0.6 Hours Canopy Molding
06/05/22 2.8 Hours Front Canopy Molding
06/04/22 4.5 Hours Canopy Fit, Aft Window Backing Strips
05/30/22 3.2 Hours Canopy Fit
05/29/22 0.9 Hours Canopy Fit
05/22/22 2.2 Hours Canopy Handle, Fit
05/21/22 4.8 Hours Misc Riveting, Wheels Installed
05/08/22 4.4 Hours Canopy Latch Lugs, Fit
05/07/22 4.5 Hours Misc Riveting, Wheels, Canopy Assembly
05/06/22 4.4 Hours Canopy Frame Painting, Misc Fuselage Riveting, Installed Gear Legs, Started on Wheels
05/05/22 6.0 Hours Canopy Deck Riveting, Finished Canopy Frame Riveting, Canopy Struts
05/04/22 5.0 Hours Aft Top Skin Riveting
05/03/22 5.6 Hours Misc Aft Fuselage Installs, Aft Fuselage Top Skin Riveting
04/10/22 4.1 Hours Canopy Frame Priming and Riveting
04/07/22 1.5 Hours Canopy Misc
04/02/22 2.0 Hours Canopy Frame Prepping
03/31/22 1.2 Hours Canopy Frame Prepping
03/30/22 1.7 Hours Gas Strut Mounts
03/27/22 2.0 Hours More Side Skirts
03/26/22 2.7 Hours Canopy Side Skirt Fitting
03/24/22 4.4 Hours Canopy Backing Strip, Trimming, Adjusting
03/20/22 2.8 Hours Rear Window Countersinking, Fabbing Backing Strip
03/14/22 1.2 Hours Tapped Rollbar Holes, Trimmed Aft Window
03/13/22 6.0 Hours Canopy Countersinking, Drilling, Fitting
03/12/22 5.2 Hours Canopy Drilling
03/01/22 1.8 Hours Canopy Fitting
02/28/22 2.5 Hours Made the Big Canopy Cut, More Fitting
02/27/22 2.5 Hours Canopy Fitting
02/26/22 3.5 Hours Started Canopy Trimming
02/21/22 1.0 Hours Landing Gear Legs
02/19/22 2.5 Hours More Canopy Front Deck Fitting
02/18/22   Castered & Strengthened Main Fuselage Sawhorse
01/23/22 2.0 Hours Gear Leg Installation
01/17/22 3.8 Hours Canopy Misc, Engine Mount Drilling
01/13/22 1.0 Hours Canopy Misc
01/12/22 2.0 Hours Canopy Misc
01/11/22 1.5 Hours Canopy Forward Skin Shrinking
01/10/22 3.3 Hours Canopy Braces/Struts
01/09/22 2.5 Hours Canopy Reinforcement Fitting & Drilling
01/08/22 4.3 Hours Canopy Frame Drilling, Riveting
01/07/22 5.0 Hours Canopy Frame Fitting & Drilling
01/06/22 2.2 Hours Canopy Fitting
01/04/22 5.4 Hours Canopy Frame Drilling
01/03/22 7.0 Hours Canopy Frame Prep, Drilling, Fitting
01/02/22 4.0 Hours Canopy Latch Mechanism
12/31/21 5.0 Hours Canopy Hinges, Latch
12/14/21   Finish Kit Unpacking
11/05/21 2.5 Hours Installed Center Tunnel Fuel Line, Plus Some Prosealing
10/30/21 2.0 Hours Left Wing Landing Light Lens, Misc
10/26/21 2.0 Hours Firewall Fuel Passthrough and Contactor Nutplates
10/25/21 0.8 Hours Firewall Fuel Passthrough Doubler
10/24/21 4.5 Hours Finished Boost Pump Enclosure, Plumbing
10/23/21 2.2 Hours Primed Boost Pump Cover, Prosealed NACA Ducts
10/17/21 2.5 Hours Boost Pump Kit
10/16/21 4.0 Hours Finished Battery Box
10/13/21 1.0 Hours Battery Box Fabrication
10/12/21 1.5 Hours ELT Tray Installation
10/11/21 3.2 Hours Left Wingtip Sanding, Lens
10/10/21 3.0 Hours Left Wingtip Nutplates, Dimpling
10/09/21 1.8 Hours Left Wingtip Rib, Nutplates
10/08/21 2.3 Hours Left Wingtip Drilling, Rib
10/07/21 0.5 Hours Left Wingtip, Stick Boot Rings
10/06/21 1.5 Hours Left Wingtip Install, continued
10/05/21 1.0 Hours Left Wingtip Install, continued
10/04/21 2.5 Hours Started Left Wingtip Install
10/03/21 4.5 Hours New Landing Lights, New Pitot Tube Mount
10/02/21 1.8 Hours Stick Boot Rings
09/27/21 3.0 Hours Bolted Rudder Pedals, Installed Brake Lines, Aft Inspection Plate Covers
09/25/21 6.0 Hours Static Line Routing, Wiring Holes in F-706, Reinstalled Control Pushrod, Installed Brake Reservoir
09/24/21 4.0 Hours Misc. Priming & Riveting, Installed Static Ports
09/23/21 3.0 Hours Aileron Trim Install
09/20/21 3.5 Hours Elevator Trim, Aileron Trim
09/19/21 1.0 Hours Finished Empennage Tips (for now)
09/18/21 1.5 Hours Empennage Tip Priming
09/17/21 0.8 Hours Empennage Tips
09/16/21 2.0 Hours Empennage Tips
09/15/21 1.0 Hours Empennage Tips
09/14/21 1.3 Hours Empennage Tips
09/13/21 1.6 Hours Empennage Tips
09/12/21 3.3 Hours Empennage Tips
09/11/21 4.0 Hours Empennage Tips, Various Tasks
09/09/21 1.5 Hours HS Tip, Elevator Tip Sanding, Filling
09/08/21 1.0 Hours HS Tip Reinforcement, Elevator Tip Touchup
09/06/21 1.0 Hours HS Tip Ribs
09/05/21 1.0 Hours Elevator tips sanding & priming
09/04/21 4.5 Hours Elevator & HS tips
09/01/21 1.0 Hours Sanding Elevator Tips
08/28/21 4.5 Hours Fiberglass Elevator Tip Installation
05/29/21 0.8 Hours Misc Interior Painting
05/26/21 2.2 Hours Reassembling Interior
05/24/21 0.8 Hours Interior Painting
05/23/21 1.5 Hours Interior Painting
05/22/21 3.2 Hours Interior Painting
05/08/21 2.0 Hours Interior Painting
05/07/21 2.2 Hours Interior Paint Prep
05/05/21 1.9 Hours Interior Painting
05/04/21 1.8 Hours Interior Painting
05/01/21 5.5 Hours Air Vents, Painting Prep
04/30/21 2.0 Hours Forward Deck Deburring, Priming, Painting
04/29/21 1.5 Hours Forward Deck Deburring, Priming, Painting
04/28/21 1.6 Hours Forward Deck Prep
04/27/21 2.0 Hours Forward Deck Misc
04/26/21 3.8 Hours Forward Deck Assembly
04/25/21 3.5 Hours Forward Deck Assembly
04/24/21 5.0 Hours Cabin Frame Roll Bar Installation
04/20/21 2.0 Hours Cabin Frame Roll Bar Angles
04/19/21 1.5 Hours Cabin Frame Roll Bar Countersinking, Riveting
04/18/21 3.8 Hours Forward Deck Angle Fabrication, Drilling
04/16/21 1.2 Hours Forward Deck Angle Fab
04/15/21 2.2 Hours Cabin Frame Roll Bar Priming, Riveting
04/13/21 1.3 Hours Cabin Frame Rollbar Countersinking
04/12/21 1.2 Hours Cabin Frame Prep
04/11/21 2.8 Hours Cabin Frame Roll Bar Drilling
04/10/21 1.0 Hours Cabin Frame Misc
04/09/21 3.2 Hours More Cabin Frame Rollbar Drilling
04/08/21 2.2 Hours Cabin Frame Roll Bar Drilling
04/07/21 1.8 Hours Cabin Frame Roll Bar
04/06/21 1.8 Hours Cabin Frame Roll Bar
04/05/21 1.8 Hours Cabin Frame Roll Bar Angles
04/04/21 2.0 Hours Side Channel Covers, Cabin Frame Roll Bar
04/03/21 3.0 Hours Crotch Strap Brackets
09/27/20 3.0 Hours Left Elevator Control Horn Doubler, Misc
09/26/20 3.8 Hours Rudder Stops, Misc Priming
09/20/20 2.0 Hours Seatbacks, Electric Flap Assembly, Misc Riveting
09/19/20 7.0 Hours Elevator Up Stop, Vertical Stabilizer Fitting, Hung Rudder
09/18/20 3.0 Hours Elevator Bellcrank, Pushrods
09/17/20 4.2 Hours Mounting Horizontal Stabilizer to the Aft Fuselage
09/15/20 2.5 Hours Drilled Elevator Horns
06/12/20 0.5 Hours Finished R Wing, Rearranged Garage
05/31/20 4.0 Hours Pitot Mast, Right Wing Platenuts
05/30/20 3.0 Hours Removed L Wing, Installed Nutplates
05/25/20 1.0 Hours Finished Routing Fuel Lines
05/24/20 1.5 Hours Rigged Right Aileron
05/23/20 6.5 Hours Drilled/Fit Wing Root Fairings, Rigged L Aileron
05/19/20 1.8 Hours Fuel Selector, Fuel Lines
05/18/20 1.8 Hours Fuel Tank Vent Lines
05/17/20 6.5 Hours Flap Pushrods, Fuel Lines
05/16/20 3.8 Hours Flap Pushrods
05/15/20 3.0 Hours Attached R flap
05/14/20 6.5 Hours Fuel Tank Brackets, Center Control Column/Sticks, Mounted Ailerons, Installed Left Flap
05/13/20 6.0 Hours Drilled the Rear Spars to the Fuselage!
05/12/20 6.5 Hours Began Wing Mating
08/19/12 0.5 Hours Finished Bottom Skin Riveting
08/18/12 2.2 Hours More Left Wing Bottom Skin Riveting
08/11/12 3.0 Hours Left Wing Bottom Skin Riveting
08/24/10 2.5 Hours Finished Riveting Bottom Skins on Right Wing
08/22/10 2.5 Hours More Right Wing Bottom Skin Riveting
06/13/10 3.0 Hours Began right wing bottom skin riveting...
06/05/10 1.6 Hours Finished up the flap stuff...mostly.
06/02/10 1.3 Hours Flap Subsystem Drilling and Fitting
05/31/10 2.8 Hours Continued Flap Subsystem...
05/30/10 2.0 Hours More Electric Flap System
05/29/10 5.7 Hours More Forward Fuselage Covers, Started Electric Flap System
05/28/10 1.9 Hours Drilled F-782C Center Cabin Cover, Fab'd F-782D Angles, Drilled F-7114-R Gusset
05/26/10 0.5 Hours Fuel Valve Plate & Cover
05/23/10 1.9 Hours Seat Hinge Pins, Forward Tunnel Cover
05/22/10 5.0 Hours More Seat Fabrication
05/16/10 5.6 Hours Seat Floors and Backs
05/09/10 5.3 Hours Aft Seat Pans, Forward Tunnel Cover
05/08/10 2.6 Hours Baggage Tunnel Cover, Baggage Side Skins, Seat Pans
05/06/10 2.5 Hours Finishing Baggage Bulkhead Cover
05/05/10 3.0 Hours Baggage Bulkhead Covers
05/04/10 1.9 Hours Seatbelt Anchors, Baggage Bulkhead
05/03/10 2.8 Hours Baggage Skins, Seatbelt Anchors
05/02/10 7.4 Hours Deburred, Dimpled Top Fuse Skins, Started on Baggage Skins
05/01/10 1.6 Hours Various Fuselage Tasks
04/26/10 2.3 Hours Fitted Aft and Forward Top Skins
04/25/10 5.3 Hours Seat Belt Anchors, F-706 Bulkhead, Bellcrank, F-706/705 Gussets
04/24/10 1.8 Hours Drilled and Riveted Firewall/Longeron Gussets
04/23/10 2.2 Hours Canopy Deck Drilling, Firewall Gusset
04/22/10 1.1 Hours More side rails and gussets...
04/20/10 3.0 Hours Riveted Aft Deck, Started on Side Rails and Gusset
04/19/10 1.2 Hours Aft Deck Prep
04/18/10 4.8 Hours Flipped the Fuselage!
04/17/10 2.7 Hours Fuselage Riveting
04/11/10 1.0 Hours More Fuselage Riveting
03/14/10 1.4 Hours More Fuselage Riveting
01/01/10 1.4 Hours Even More.... Fuselage Riveting!
12/31/09 0.7 Hours More Fuselage Riveting
12/25/09 1.2 Hours More Solo Fuselage Riveting
12/23/09 1.5 Hours Fuselage Riveting
12/22/09 1.7 Hours Fuselage Riveting
12/21/09 2.8 Hours Forward Fuselage Riveting, Misc...
12/20/09 5.5 Hours Primed Longerons, Started Fuselage Reassembly
12/19/09 7.6 Hours Various Fuselage Prep Tasks
12/16/09 1.8 Hours Deburring Center Section, F-715 ribs, etc...
12/15/09 1.8 Hours More Deburring, Countersinking, Disassembly
12/13/09 8.9 Hours Endless Deburring, Dimpling, and Priming
12/12/09 4.0 Hours Drilling, Disassembly, Countersinking, Deburring
12/08/09 1.5 Hours Misc. Fuselage Drilling
12/06/09 5.0 Hours Finished Rudder Pedal Drilling, Drilled Floor Stiffeners, Drilled Baggage Side Skeleton
12/05/09 5.2 Hours Brake/Rudder Pedal Assembly
12/03/09 1.5 Hours More Forward Bottom Skin Drilling, Started Brake Pedals
12/02/09 2.5 Hours Fabricated and Drilled F-796A, B, C, and D
12/01/09 1.7 Hours Drilled F-7101 and F-902
11/30/09 2.8 Hours Forward Fuse Longerons and Gussets
11/29/09 5.1 Hours Forward Fuselage Longeron Drilling
11/28/09 1.2 Hours Drilled Firewall to side skins
11/27/09 6.5 Hours Rolled F-770 Side Skins, Drilled Longerons, Started Fitting Firewall
11/26/09 3.5 Hours Finished Aft Fuse Riveting, Mated Center Section
11/25/09 3.2 Hours Riveting Aft Fuselage
11/04/09 1.2 Hours Finished Drilling F-715 Seat Ribs
11/03/09 0.8 Hours Began Riveting Aft Fuselage
11/01/09 1.7 Hours Drilling Baggage Area Floor & Seat Pans, Drilling F-715 Ribs
10/24/09 0.8 Hours Finished Riveting Center Fuselage Bottom Skin
10/18/09 1.0 Hours Riveting Center Fuselage Bottom Skin
10/11/09 4.6 Hours Center Fuse Riveting & Skin Prep
10/01/09 1.0 Hours Finished prepping baggage area ribs
09/30/09 1.7 Hours Finished Riveting Seat Ribs to F-704B, Prepped Baggage Ribs
09/29/09 3.0 Hours Assembling the Center Section
09/27/09 4.1 Hours Deburred & Primed Seat Ribs
08/30/09 1.1 Hours Drilled second crotch strap bracket
07/27/09 2.0 Hours Started installing crotch strap brackets
07/12/09 1.6 Hours Center Fuse Drilling
07/11/09 7.0 Hours Center Fuselage Fabricating, Drilling
07/10/09 2.3 Hours Cleco'd Aft Fuselage, Started Center Fuselage Tasks
07/06/09 1.5 Hours Aft Fuselage Riveting
07/05/09 4.1 Hours Aft Fuselage Dimpling & Priming
07/04/09 2.8 Hours Aft Fuselage Deburring, Dimpling
07/03/09 7.9 Hours Aft Fuselage Drilling, Deburring, Deblueing
06/28/09 6.7 Hours Cleco'd Aft Fuselage, Started Drilling
06/23/09 0.8 Hours More Aft Bottom Skin / Tail Spring
06/22/09 1.2 Hours More Aft Fuselage
06/21/09 7.0 Hours Longeron Bending, Part 3
06/19/09 1.2 Hours Bending Longerons, Part 2
06/18/09 0.8 Hours Longeron Bending, Part 1
06/14/09 3.3 Hours Finished F-711, F-712; Started Longerons
06/14/09 3.8 Hours Finished F-710, F-705; Started F-711
06/11/09 0.5 Hours More F-705, F-711 Misc
06/08/09 2.0 Hours F-705 Prep & Prime, F-709, F-710
06/07/09 2.9 Hours More F-705 Bulkhead Drilling and Riveting
06/06/09 3.0 Hours F-705 Bulkhead Drilling, Deburring, Riveting
06/02/09 0.8 Hours Finished Riveting F-706 Bulkhead
06/01/09 0.8 Hours Worked on F-706 Bulkhead
01/20/09 2.0 Hours F-707/8 Riveting, F-706 Drilling
01/19/09 2.5 Hours F-707 and F-708 Bulkheads
01/04/09 1.3 Hours F-707 Bulkhead
01/01/09 0.8 Hours More F-706 Fiddling
12/28/08 2.8 Hours F-706 Bulkhead Work
12/27/08 1.7 Hours F-705, F-706 Bulkhead Work
12/25/08 1.3 Hours More F-705: Drilled Seatbelt Anchors
12/21/08 2.0 Hours F-705 Bulkhead Drilling
12/20/08 7.2 Hours Finished F-704 Bulkheads, Started F-705
12/19/08 1.0 Hours F-704 Control Column, Nutplates
12/17/08 0.5 Hours Bolted Control Column to F-704
12/16/08 3.0 Hours Continued F-704 Bulkhead Work
12/15/08 2.0 Hours Finished Firewall, Started F-704 Bulkhead
12/14/08 6.7 Hours Firewall Priming, Riveting
12/13/08 5.2 Hours Firewall Layout, Drilling
12/12/08 1.5 Hours Fuselage Arrives, Begin Firewall
12/05/08   More Shop Stuff
11/25/08   Misc Shop Stuff
11/02/08 0.8 Hours Installed Left Wing Conduit
10/27/08 4.5 Hours Left Wing Aileron Brackets, Flap Brace, Aileron Gap Fairing
10/26/08 5.0 Hours Pushrods, Finished Left Wing Top Skin Riveting, Demolished Wing Jig
10/23/08 0.5 Hours Fuel Tank De-Leaking, Misc
10/22/08 1.9 Hours Tank Testing, Aileron Pushrods, Top Skin Riveting
10/22/08 0.7 Hours Fuel Tank Testing, Pushrods
10/13/08 7.0 Hours Fuse Ordered, Finished Fuel Tank, Wing Prep, Pushrods
10/12/08 6.5 Hours Finished Both Ailerons
10/11/08 10.0 Hours Aileron Construction, Fuel Tank Misc
10/10/08 1.0 Hours Finished Rudder, Started Ailerons
10/08/08 2.0 Hours Riveting Inboard Fuel Tank Rib, Misc
10/05/08 5.2 Hours Fuel Tank Misc, Began Aileron Pushrods
10/04/08 2.8 Hours More Wing Prep, Fuel Tank Misc
10/03/08 2.2 Hours More Wing Prep
10/02/08 3.9 Hours Left Wing Prep
10/01/08 2.0 Hours Leading Edge Riveting, Wing Skeleton Prep
08/10/08 2.0 Hours Attached Left Leading Edge To Wing
08/09/08 2.0 Hours Left Landing Light
08/08/08 7.5 Hours Fuel Tank Rib Riveting, Rudder Rolling & Riveting, Leading Edge Riveting
08/06/08 1.0 Hours Left Leading Edge Prep
07/27/08 0.5 Hours Left Fuel Tank Joint Plate Prep
07/26/08 1.0 Hours Wing Misc
07/20/08 2.0 Hours Left Fuel Tank Rib Riveting
07/19/08 0.8 Hours Aileron Misc
07/15/08 1.6 Hours Riveted First Left Fuel Tank Rib
07/13/08 6.0 Hours Fuel Tank Prep, Riveting/Sealing
07/12/08 7.5 Hours Fuel Tank Drilling, Prep
07/11/08 1.8 Hours Z-Bracket Drilling
07/08/08 3.0 Hours Left Wing Drilling
07/07/08 2.8 Hours Left Wing Drilling
07/06/08 9.4 Hours Flaps Finished
07/05/08 3.8 Hours More Flap Deburring, Prep
07/04/08 3.2 Hours Flap Drilling, Deburring, Priming
07/03/08 0.8 Hours Flap Prep
07/02/08 2.0 Hours Flap Drilling
06/30/08 3.2 Hours Flaps Prep, Drilling
06/29/08 8.5 Hours Right Wing Aileron Gap Faring, Flap Brace, Skin Prep
06/28/08 6.5 Hours Wing Potpourri
06/27/08 2.2 Hours Left Wing Skeleton Prep
06/26/08 2.0 Hours Aileron Spars Deburring, Priming
06/25/08 1.5 Hours Aileron Bending, Skeleton Drilling
06/24/08   Built Wing Cradle
06/23/08 1.8 Hours Riveted Aileron Stiffeners
06/22/08 2.5 Hours Aileron Deburring, Priming, Dimpling
06/20/08 1.0 Hours Aileron Stiffener Drilling, Deburring
06/18/08 2.0 Hours Aileron Stiffener Shaping, Finished Top Right Wing Skin Riveting
06/17/08 1.8 Hours Aileron Stiffeners, Wing Skin Riveting
06/16/08 1.5 Hours Wing Skin Riveting
06/15/08 1.2 Hours Wing Skin Riveting
06/05/08 0.8 Hours Wing Misc
05/07/08 1.5 Hours Wing Misc
05/05/08 0.8 Hours Top Wing Skin Prep
05/03/08 0.8 Hours Fuel Tank Fit, Scarf Joint
04/27/08 4.8 Hours Riveted Leading Edge, Misc
04/26/08 2.0 Hours Leading Edge
04/22/08 1.4 Hours Landing Light/Leading Edge
04/20/08 4.8 Hours Landing Light
04/18/08 0.8 Hours Landing Light
04/17/08 2.0 Hours Leading Edge
04/15/08 1.0 Hours Leading Edge Riveting
04/14/08 1.9 Hours Leading Edge Riveting
04/13/08 5.0 Hours Wing Prep
04/12/08 2.8 Hours Fuel Tank Leak Testing & Wing Prep
04/11/08 6.8 Hours Finished Sealing Tank
04/10/08 4.6 Hours Fuel Tank Sealing
04/09/08 2.8 Hours Fuel Tank Sealing
04/07/08   Shop Cleanup
04/06/08 4.5 Hours Fuel Tank Misc
04/05/08 1.5 Hours Fuel Tank Misc
04/04/08 6.4 Hours Left Leading Edge Prep & Fuel Tank Sealing
04/03/08 1.5 Hours Fuel Tank Rib Sealing
04/02/08 4.7 Hours Fuel Tank Sealing
04/01/08 1.5 Hours Fuel Tank Preparation
03/24/08 0.7 Hours More Fuel Tank Prep
03/23/08 6.0 Hours Fuel Tank Prep
03/19/08 1.2 Hours Fuel Tank Cap & Drain
03/16/08 0.5 Hours Capacitive Fuel Probes
03/14/08 4.2 Hours Fuel Tank Details
03/13/08 4.2 Hours Fuel Tank Stuff
03/12/08 0.8 Hours Fuel Tank Drilling
03/12/08 1.2 Hours Fuel Tank Stiffener Fabrication
03/10/08   Wing Reconstruction
03/03/08   More Shop
02/25/08   Shop Setup!
04/01/07 2.5 Hours Fuel Tank Stuff
03/30/07 2.5 Hours Drilled Z-brackets for Right Fuel Tank
03/29/07 0.3 Hours Fuel Tank Assembly
03/26/07 0.8 Hours Fuel Tank Assembly
03/25/07 3.8 Hours More Wing Assembly, Drilling
03/24/07 5.0 Hours Wing Jig, Drilling
03/23/07   Wing Jig Work
03/22/07 2.0 Hours Riveted Right Wing Rear Spar
03/21/07 2.5 Hours Right Wing Riveting
03/20/07   Wing Jig
03/18/07 1.5 Hours Wing Jig Construction, Rib Priming
03/17/07 2.2 Hours Wing Rib Cleaning
03/16/07 4.5 Hours Wing Rib Priming Prep
03/15/07 3.0 Hours Left Wing Drilling, Tapped Tie Downs
03/14/07 4.0 Hours Right Wing Spar/Rib Drilling, Deburring
03/13/07 0.5 Hours Stored HS, Drilled Pitot/AOA Line Holes
03/12/07 3.0 Hours Elevators Mounted to HS
03/11/07 5.8 Hours Left Elevator Leading Edge Rolling, Wing Conduit Holes
03/10/07 4.0 Hours Trim Tab Riveting
03/08/07 2.0 Hours Trim Tab Work (and Problems)
03/07/07 4.2 Hours Trim Tab Bending, Drilling, Etc
03/06/07 4.2 Hours Wing Rib Flanging and Fluting
03/05/07 4.0 Hours Wing Rib Deburring, Flanging
03/04/07 4.4 Hours Left Elevator Riveting, Trim Tab Bending, Tank Rib Deburring
03/03/07 4.5 Hours Left Elevator Tab Bending, Servo, Riveting
03/02/07 2.5 Hours Left Elevator C'Sinking, Priming
03/01/07 3.5 Hours Left Elevator Deburring, Dimpling, Misc
02/28/07 3.0 Hours Left Elevator Drilling, Deburring
02/27/07 4.0 Hours Wing Leading Edge / Tank Rib Deburring
02/26/07 2.0 Hours Wing Leading Edge Rib Deburring
02/25/07 8.0 Hours Wing Rib Deburring
02/23/07 3.5 Hours Finished Rear Wing Spar Prep
02/22/07 3.0 Hours Wing Rear Spar Prep
02/21/07 4.5 Hours Wing Rear Spar Prep
02/20/07 4.5 Hours Wing Rear Spar Prep, Misc
02/19/07 6.0 Hours Left Elevator, Wing Main Spar Tie Downs
02/18/07 7.5 Hours Wing Countersinking, Misc
02/15/07 4.5 Hours Wing Spar Countersinking, Nutplates
02/14/07 3.5 Hours Wing Main Spar Countersinking
02/13/07 0.5 Hours Left Elevator Control Horn Problems
02/12/07 4.0 Hours Left Elevator Stiffener Riveting, Skeleton Drilling
02/11/07 4.0 Hours Right Elevator Completed!
01/29/07 5.0 Hours Riveted Right Elevator
01/28/07 2.0 Hours Right Elevator Priming
01/25/07 4.0 Hours Right Elevator Deburring, Dimpling
01/24/07 3.0 Hours Right Elevator Drilling
01/23/07 4.0 Hours Elevators and more!
01/15/07 3.0 Hours Left Elevator Dimpling
01/14/07 1.5 Hours Left Elevator Trim Cutout Deburring
01/03/07 2.0 Hours Drilled Left Elevator
01/02/07 1.0 Hours Built Bending Brake
12/31/06 3.0 Hours Riveted Right Elevator Stiffeners
12/30/06 0.5 Hours Primed Elevator Stiffeners
12/29/06 1.5 Hours Right Elevator Stiffeners
12/28/06 3.0 Hours Right Elevator Stiffener Prep
12/23/06   Christmas
12/18/06 2.0 Hours Right Elevator Stiffeners Drilled
12/17/06 6.0 Hours Elevator Stiffers & Rudder Trailing Edge
12/14/06 1.0 Hours Rudder TE Prep
12/07/06 2.0 Hours Rudder TE
12/07/06 1.5 Hours Rudder
11/28/06 3.0 Hours Rudder Rivetting
11/27/06 3.0 Hours Rudder Rivetting
11/26/06 3.0 Hours Shop Cleanup, Rudder Prep & Priming
11/21/06   Wing Parts Cleanup
11/16/06   Wings Arrive
11/07/06   Nothing to report...
10/26/06 4.0 Hours Rudder Prep
10/25/06 1.0 Hours Rudder Prep
10/24/06 1.5 Hours Rudder Deburring
10/23/06 3.0 Hours Rudder Work
10/16/06   Tech Counselor Visit
10/12/06   Rudder Issues
10/09/06 1.5 Hours Rudder Work
10/05/06 2.0 Hours Rudder Skeleton
10/04/06 0.5 Hours Finished Riveting Rudder Stiffeners
10/03/06 1.2 Hours Rudder Stiffener Riveting
10/02/06 2.2 Hours Finished HS!
10/01/06 4.5 Hours Priming Stiffeners & HS Riveting
09/25/06 0.2 Hours Rudder Dimpling
09/22/06 1.0 Hours Rudder Skins
09/20/06 2.5 Hours Rudder Stiffeners
09/19/06 2.0 Hours VS Finished!
09/18/06 1.5 Hours VS Riveting
09/17/06 9.2 Hours VS & HS Riveting, Rudder Stiffeners
09/16/06 6.2 Hours HS Riveting
09/15/06 4.5 Hours VS & HS Prep & Priming
09/15/06   Wing Kit Ordered
09/14/06 3.0 Hours VS Edge Prep, Dimpling, C'sinking
09/13/06 1.2 Hours VS Deburring & Edge Prep
09/13/06 0.5 Hours VS Disassembly & Deburring
09/13/06   Primers
09/11/06 3.0 Hours VS Prep & Drilling
09/10/06 6.5 Hours HS Prep, VS Assembly
09/08/06 0.5 Hours HS Deburring
09/07/06 1.5 Hours HS Deburring
09/06/06 2.5 Hours Horizontal Stabilizer Drilling
09/04/06 8.0 Hours Horizontal Stabilizer
08/31/06 2.5 Hours HS Front & Rear Spars
08/29/06 3.0 Hours HS Rear Spar Stiffeners
08/28/06   Workshop
08/25/06   Misc
08/20/06   Shop & Tools
08/12/06   SportAir Workshop Update
08/11/06   Empennage Kit Arrived
08/08/06   Tools
08/05/06   Tools Arrived
08/01/06   Empennage Ordered
07/30/06   Oshkosh
07/26/06   Random Stuff
07/20/06   Grinder & Drill Press
07/18/06   More work in the shop
07/10/06   More Workshop
07/08/06   Preview Plans & Shop Setup
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed. I stopped tracking times in 2024.