| Date |
*Time |
Summary |
| 04/30/21 |
2.0 Hours
|
Forward Deck Deburring, Priming, Painting |
| 04/29/21 |
1.5 Hours
|
Forward Deck Deburring, Priming, Painting |
| 04/28/21 |
1.6 Hours
|
Forward Deck Prep |
| 04/27/21 |
2.0 Hours
|
Forward Deck Misc |
| 04/26/21 |
3.8 Hours
|
Forward Deck Assembly |
| 04/25/21 |
3.5 Hours
|
Forward Deck Assembly |
| 04/24/21 |
5.0 Hours
|
Cabin Frame Roll Bar Installation |
| 04/20/21 |
2.0 Hours
|
Cabin Frame Roll Bar Angles |
| 04/19/21 |
1.5 Hours
|
Cabin Frame Roll Bar Countersinking, Riveting |
| 04/18/21 |
3.8 Hours
|
Forward Deck Angle Fabrication, Drilling |
| 04/16/21 |
1.2 Hours
|
Forward Deck Angle Fab |
| 04/15/21 |
2.2 Hours
|
Cabin Frame Roll Bar Priming, Riveting |
| 04/13/21 |
1.3 Hours
|
Cabin Frame Rollbar Countersinking |
| 04/12/21 |
1.2 Hours
|
Cabin Frame Prep |
| 04/11/21 |
2.8 Hours
|
Cabin Frame Roll Bar Drilling |
| 04/10/21 |
1.0 Hours
|
Cabin Frame Misc |
| 04/09/21 |
3.2 Hours
|
More Cabin Frame Rollbar Drilling |
| 04/08/21 |
2.2 Hours
|
Cabin Frame Roll Bar Drilling |
| 04/07/21 |
1.8 Hours
|
Cabin Frame Roll Bar |
| 04/06/21 |
1.8 Hours
|
Cabin Frame Roll Bar |
| 04/05/21 |
1.8 Hours
|
Cabin Frame Roll Bar Angles |
| 04/04/21 |
2.0 Hours
|
Side Channel Covers, Cabin Frame Roll Bar |
| 04/03/21 |
3.0 Hours
|
Crotch Strap Brackets |
|
* Notes approximate time spent working on the plane itself. I exclude time spent
shopping, building tables and jigs, or cleaning up the shop. Accuracy of times
is not guaranteed.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International   
|