Date *Time Summary
04/01/07 2.5 Hours Fuel Tank Stuff
03/30/07 2.5 Hours Drilled Z-brackets for Right Fuel Tank
03/29/07 0.3 Hours Fuel Tank Assembly
03/26/07 0.8 Hours Fuel Tank Assembly
03/25/07 3.8 Hours More Wing Assembly, Drilling
03/24/07 5.0 Hours Wing Jig, Drilling
03/23/07   Wing Jig Work
03/22/07 2.0 Hours Riveted Right Wing Rear Spar
03/21/07 2.5 Hours Right Wing Riveting
03/20/07   Wing Jig
03/18/07 1.5 Hours Wing Jig Construction, Rib Priming
03/17/07 2.2 Hours Wing Rib Cleaning
03/16/07 4.5 Hours Wing Rib Priming Prep
03/15/07 3.0 Hours Left Wing Drilling, Tapped Tie Downs
03/14/07 4.0 Hours Right Wing Spar/Rib Drilling, Deburring
03/13/07 0.5 Hours Stored HS, Drilled Pitot/AOA Line Holes
03/12/07 3.0 Hours Elevators Mounted to HS
03/11/07 5.8 Hours Left Elevator Leading Edge Rolling, Wing Conduit Holes
03/10/07 4.0 Hours Trim Tab Riveting
03/08/07 2.0 Hours Trim Tab Work (and Problems)
03/07/07 4.2 Hours Trim Tab Bending, Drilling, Etc
03/06/07 4.2 Hours Wing Rib Flanging and Fluting
03/05/07 4.0 Hours Wing Rib Deburring, Flanging
03/04/07 4.4 Hours Left Elevator Riveting, Trim Tab Bending, Tank Rib Deburring
03/03/07 4.5 Hours Left Elevator Tab Bending, Servo, Riveting
03/02/07 2.5 Hours Left Elevator C'Sinking, Priming
03/01/07 3.5 Hours Left Elevator Deburring, Dimpling, Misc
02/28/07 3.0 Hours Left Elevator Drilling, Deburring
02/27/07 4.0 Hours Wing Leading Edge / Tank Rib Deburring
02/26/07 2.0 Hours Wing Leading Edge Rib Deburring
02/25/07 8.0 Hours Wing Rib Deburring
02/23/07 3.5 Hours Finished Rear Wing Spar Prep
02/22/07 3.0 Hours Wing Rear Spar Prep
02/21/07 4.5 Hours Wing Rear Spar Prep
02/20/07 4.5 Hours Wing Rear Spar Prep, Misc
02/19/07 6.0 Hours Left Elevator, Wing Main Spar Tie Downs
02/18/07 7.5 Hours Wing Countersinking, Misc
02/15/07 4.5 Hours Wing Spar Countersinking, Nutplates
02/14/07 3.5 Hours Wing Main Spar Countersinking
02/13/07 0.5 Hours Left Elevator Control Horn Problems
02/12/07 4.0 Hours Left Elevator Stiffener Riveting, Skeleton Drilling
02/11/07 4.0 Hours Right Elevator Completed!
01/29/07 5.0 Hours Riveted Right Elevator
01/28/07 2.0 Hours Right Elevator Priming
01/25/07 4.0 Hours Right Elevator Deburring, Dimpling
01/24/07 3.0 Hours Right Elevator Drilling
01/23/07 4.0 Hours Elevators and more!
01/15/07 3.0 Hours Left Elevator Dimpling
01/14/07 1.5 Hours Left Elevator Trim Cutout Deburring
01/03/07 2.0 Hours Drilled Left Elevator
01/02/07 1.0 Hours Built Bending Brake