Date *Time Summary
01/29/07 5.0 Hours Riveted Right Elevator
01/28/07 2.0 Hours Right Elevator Priming
01/25/07 4.0 Hours Right Elevator Deburring, Dimpling
01/24/07 3.0 Hours Right Elevator Drilling
01/23/07 4.0 Hours Elevators and more!
01/15/07 3.0 Hours Left Elevator Dimpling
01/14/07 1.5 Hours Left Elevator Trim Cutout Deburring
01/03/07 2.0 Hours Drilled Left Elevator
01/02/07 1.0 Hours Built Bending Brake
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed. I stopped tracking times in 2024.