Date |
*Time |
Summary |
01/29/07 |
5.0 Hours
|
Riveted Right Elevator |
01/28/07 |
2.0 Hours
|
Right Elevator Priming |
01/25/07 |
4.0 Hours
|
Right Elevator Deburring, Dimpling |
01/24/07 |
3.0 Hours
|
Right Elevator Drilling |
01/23/07 |
4.0 Hours
|
Elevators and more! |
01/15/07 |
3.0 Hours
|
Left Elevator Dimpling |
01/14/07 |
1.5 Hours
|
Left Elevator Trim Cutout Deburring |
01/03/07 |
2.0 Hours
|
Drilled Left Elevator |
01/02/07 |
1.0 Hours
|
Built Bending Brake |
|
* Notes approximate time spent working on the plane itself. I exclude time spent
shopping, building tables and jigs, or cleaning up the shop. Accuracy of times
is not guaranteed.
|