Date *Time Summary
02/28/07 3.0 Hours Left Elevator Drilling, Deburring
02/27/07 4.0 Hours Wing Leading Edge / Tank Rib Deburring
02/26/07 2.0 Hours Wing Leading Edge Rib Deburring
02/25/07 8.0 Hours Wing Rib Deburring
02/23/07 3.5 Hours Finished Rear Wing Spar Prep
02/22/07 3.0 Hours Wing Rear Spar Prep
02/21/07 4.5 Hours Wing Rear Spar Prep
02/20/07 4.5 Hours Wing Rear Spar Prep, Misc
02/19/07 6.0 Hours Left Elevator, Wing Main Spar Tie Downs
02/18/07 7.5 Hours Wing Countersinking, Misc
02/15/07 4.5 Hours Wing Spar Countersinking, Nutplates
02/14/07 3.5 Hours Wing Main Spar Countersinking
02/13/07 0.5 Hours Left Elevator Control Horn Problems
02/12/07 4.0 Hours Left Elevator Stiffener Riveting, Skeleton Drilling
02/11/07 4.0 Hours Right Elevator Completed!
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed. I stopped tracking times in 2024.


This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International