Date *Time Summary
12/28/08 2.8 Hours F-706 Bulkhead Work
12/27/08 1.7 Hours F-705, F-706 Bulkhead Work
12/25/08 1.3 Hours More F-705: Drilled Seatbelt Anchors
12/21/08 2.0 Hours F-705 Bulkhead Drilling
12/20/08 7.2 Hours Finished F-704 Bulkheads, Started F-705
12/19/08 1.0 Hours F-704 Control Column, Nutplates
12/17/08 0.5 Hours Bolted Control Column to F-704
12/16/08 3.0 Hours Continued F-704 Bulkhead Work
12/15/08 2.0 Hours Finished Firewall, Started F-704 Bulkhead
12/14/08 6.7 Hours Firewall Priming, Riveting
12/13/08 5.2 Hours Firewall Layout, Drilling
12/12/08 1.5 Hours Fuselage Arrives, Begin Firewall
12/05/08   More Shop Stuff
11/25/08   Misc Shop Stuff
11/02/08 0.8 Hours Installed Left Wing Conduit
10/27/08 4.5 Hours Left Wing Aileron Brackets, Flap Brace, Aileron Gap Fairing
10/26/08 5.0 Hours Pushrods, Finished Left Wing Top Skin Riveting, Demolished Wing Jig
10/23/08 0.5 Hours Fuel Tank De-Leaking, Misc
10/22/08 1.9 Hours Tank Testing, Aileron Pushrods, Top Skin Riveting
10/22/08 0.7 Hours Fuel Tank Testing, Pushrods
10/13/08 7.0 Hours Fuse Ordered, Finished Fuel Tank, Wing Prep, Pushrods
10/12/08 6.5 Hours Finished Both Ailerons
10/11/08 10.0 Hours Aileron Construction, Fuel Tank Misc
10/10/08 1.0 Hours Finished Rudder, Started Ailerons
10/08/08 2.0 Hours Riveting Inboard Fuel Tank Rib, Misc
10/05/08 5.2 Hours Fuel Tank Misc, Began Aileron Pushrods
10/04/08 2.8 Hours More Wing Prep, Fuel Tank Misc
10/03/08 2.2 Hours More Wing Prep
10/02/08 3.9 Hours Left Wing Prep
10/01/08 2.0 Hours Leading Edge Riveting, Wing Skeleton Prep
08/10/08 2.0 Hours Attached Left Leading Edge To Wing
08/09/08 2.0 Hours Left Landing Light
08/08/08 7.5 Hours Fuel Tank Rib Riveting, Rudder Rolling & Riveting, Leading Edge Riveting
08/06/08 1.0 Hours Left Leading Edge Prep
07/27/08 0.5 Hours Left Fuel Tank Joint Plate Prep
07/26/08 1.0 Hours Wing Misc
07/20/08 2.0 Hours Left Fuel Tank Rib Riveting
07/19/08 0.8 Hours Aileron Misc
07/15/08 1.6 Hours Riveted First Left Fuel Tank Rib
07/13/08 6.0 Hours Fuel Tank Prep, Riveting/Sealing
07/12/08 7.5 Hours Fuel Tank Drilling, Prep
07/11/08 1.8 Hours Z-Bracket Drilling
07/08/08 3.0 Hours Left Wing Drilling
07/07/08 2.8 Hours Left Wing Drilling
07/06/08 9.4 Hours Flaps Finished
07/05/08 3.8 Hours More Flap Deburring, Prep
07/04/08 3.2 Hours Flap Drilling, Deburring, Priming
07/03/08 0.8 Hours Flap Prep
07/02/08 2.0 Hours Flap Drilling
06/30/08 3.2 Hours Flaps Prep, Drilling
06/29/08 8.5 Hours Right Wing Aileron Gap Faring, Flap Brace, Skin Prep
06/28/08 6.5 Hours Wing Potpourri
06/27/08 2.2 Hours Left Wing Skeleton Prep
06/26/08 2.0 Hours Aileron Spars Deburring, Priming
06/25/08 1.5 Hours Aileron Bending, Skeleton Drilling
06/24/08   Built Wing Cradle
06/23/08 1.8 Hours Riveted Aileron Stiffeners
06/22/08 2.5 Hours Aileron Deburring, Priming, Dimpling
06/20/08 1.0 Hours Aileron Stiffener Drilling, Deburring
06/18/08 2.0 Hours Aileron Stiffener Shaping, Finished Top Right Wing Skin Riveting
06/17/08 1.8 Hours Aileron Stiffeners, Wing Skin Riveting
06/16/08 1.5 Hours Wing Skin Riveting
06/15/08 1.2 Hours Wing Skin Riveting
06/05/08 0.8 Hours Wing Misc
05/07/08 1.5 Hours Wing Misc
05/05/08 0.8 Hours Top Wing Skin Prep
05/03/08 0.8 Hours Fuel Tank Fit, Scarf Joint
04/27/08 4.8 Hours Riveted Leading Edge, Misc
04/26/08 2.0 Hours Leading Edge
04/22/08 1.4 Hours Landing Light/Leading Edge
04/20/08 4.8 Hours Landing Light
04/18/08 0.8 Hours Landing Light
04/17/08 2.0 Hours Leading Edge
04/15/08 1.0 Hours Leading Edge Riveting
04/14/08 1.9 Hours Leading Edge Riveting
04/13/08 5.0 Hours Wing Prep
04/12/08 2.8 Hours Fuel Tank Leak Testing & Wing Prep
04/11/08 6.8 Hours Finished Sealing Tank
04/10/08 4.6 Hours Fuel Tank Sealing
04/09/08 2.8 Hours Fuel Tank Sealing
04/07/08   Shop Cleanup
04/06/08 4.5 Hours Fuel Tank Misc
04/05/08 1.5 Hours Fuel Tank Misc
04/04/08 6.4 Hours Left Leading Edge Prep & Fuel Tank Sealing
04/03/08 1.5 Hours Fuel Tank Rib Sealing
04/02/08 4.7 Hours Fuel Tank Sealing
04/01/08 1.5 Hours Fuel Tank Preparation
03/24/08 0.7 Hours More Fuel Tank Prep
03/23/08 6.0 Hours Fuel Tank Prep
03/19/08 1.2 Hours Fuel Tank Cap & Drain
03/16/08 0.5 Hours Capacitive Fuel Probes
03/14/08 4.2 Hours Fuel Tank Details
03/13/08 4.2 Hours Fuel Tank Stuff
03/12/08 0.8 Hours Fuel Tank Drilling
03/12/08 1.2 Hours Fuel Tank Stiffener Fabrication
03/10/08   Wing Reconstruction
03/03/08   More Shop
02/25/08   Shop Setup!
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed. I stopped tracking times in 2024.


This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International