Date *Time Summary
10/27/08 4.5 Hours Left Wing Aileron Brackets, Flap Brace, Aileron Gap Fairing
10/26/08 5.0 Hours Pushrods, Finished Left Wing Top Skin Riveting, Demolished Wing Jig
10/23/08 0.5 Hours Fuel Tank De-Leaking, Misc
10/22/08 1.9 Hours Tank Testing, Aileron Pushrods, Top Skin Riveting
10/22/08 0.7 Hours Fuel Tank Testing, Pushrods
10/13/08 7.0 Hours Fuse Ordered, Finished Fuel Tank, Wing Prep, Pushrods
10/12/08 6.5 Hours Finished Both Ailerons
10/11/08 10.0 Hours Aileron Construction, Fuel Tank Misc
10/10/08 1.0 Hours Finished Rudder, Started Ailerons
10/08/08 2.0 Hours Riveting Inboard Fuel Tank Rib, Misc
10/05/08 5.2 Hours Fuel Tank Misc, Began Aileron Pushrods
10/04/08 2.8 Hours More Wing Prep, Fuel Tank Misc
10/03/08 2.2 Hours More Wing Prep
10/02/08 3.9 Hours Left Wing Prep
10/01/08 2.0 Hours Leading Edge Riveting, Wing Skeleton Prep
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed. I stopped tracking times in 2024.