Date *Time Summary
07/27/08 0.5 Hours Left Fuel Tank Joint Plate Prep
07/26/08 1.0 Hours Wing Misc
07/20/08 2.0 Hours Left Fuel Tank Rib Riveting
07/19/08 0.8 Hours Aileron Misc
07/15/08 1.6 Hours Riveted First Left Fuel Tank Rib
07/13/08 6.0 Hours Fuel Tank Prep, Riveting/Sealing
07/12/08 7.5 Hours Fuel Tank Drilling, Prep
07/11/08 1.8 Hours Z-Bracket Drilling
07/08/08 3.0 Hours Left Wing Drilling
07/07/08 2.8 Hours Left Wing Drilling
07/06/08 9.4 Hours Flaps Finished
07/05/08 3.8 Hours More Flap Deburring, Prep
07/04/08 3.2 Hours Flap Drilling, Deburring, Priming
07/03/08 0.8 Hours Flap Prep
07/02/08 2.0 Hours Flap Drilling
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed.