Date *Time Summary
09/27/20 3.0 Hours Left Elevator Control Horn Doubler, Misc
09/26/20 3.8 Hours Rudder Stops, Misc Priming
09/20/20 2.0 Hours Seatbacks, Electric Flap Assembly, Misc Riveting
09/19/20 7.0 Hours Elevator Up Stop, Vertical Stabilizer Fitting, Hung Rudder
09/18/20 3.0 Hours Elevator Bellcrank, Pushrods
09/17/20 4.2 Hours Mounting Horizontal Stabilizer to the Aft Fuselage
09/15/20 2.5 Hours Drilled Elevator Horns
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed.