Date *Time Summary
12/31/21 5.0 Hours Canopy Hinges, Latch
12/14/21   Finish Kit Unpacking
11/05/21 2.5 Hours Installed Center Tunnel Fuel Line, Plus Some Prosealing
10/30/21 2.0 Hours Left Wing Landing Light Lens, Misc
10/26/21 2.0 Hours Firewall Fuel Passthrough and Contactor Nutplates
10/25/21 0.8 Hours Firewall Fuel Passthrough Doubler
10/24/21 4.5 Hours Finished Boost Pump Enclosure, Plumbing
10/23/21 2.2 Hours Primed Boost Pump Cover, Prosealed NACA Ducts
10/17/21 2.5 Hours Boost Pump Kit
10/16/21 4.0 Hours Finished Battery Box
10/13/21 1.0 Hours Battery Box Fabrication
10/12/21 1.5 Hours ELT Tray Installation
10/11/21 3.2 Hours Left Wingtip Sanding, Lens
10/10/21 3.0 Hours Left Wingtip Nutplates, Dimpling
10/09/21 1.8 Hours Left Wingtip Rib, Nutplates
10/08/21 2.3 Hours Left Wingtip Drilling, Rib
10/07/21 0.5 Hours Left Wingtip, Stick Boot Rings
10/06/21 1.5 Hours Left Wingtip Install, continued
10/05/21 1.0 Hours Left Wingtip Install, continued
10/04/21 2.5 Hours Started Left Wingtip Install
10/03/21 4.5 Hours New Landing Lights, New Pitot Tube Mount
10/02/21 1.8 Hours Stick Boot Rings
09/27/21 3.0 Hours Bolted Rudder Pedals, Installed Brake Lines, Aft Inspection Plate Covers
09/25/21 6.0 Hours Static Line Routing, Wiring Holes in F-706, Reinstalled Control Pushrod, Installed Brake Reservoir
09/24/21 4.0 Hours Misc. Priming & Riveting, Installed Static Ports
09/23/21 3.0 Hours Aileron Trim Install
09/20/21 3.5 Hours Elevator Trim, Aileron Trim
09/19/21 1.0 Hours Finished Empennage Tips (for now)
09/18/21 1.5 Hours Empennage Tip Priming
09/17/21 0.8 Hours Empennage Tips
09/16/21 2.0 Hours Empennage Tips
09/15/21 1.0 Hours Empennage Tips
09/14/21 1.3 Hours Empennage Tips
09/13/21 1.6 Hours Empennage Tips
09/12/21 3.3 Hours Empennage Tips
09/11/21 4.0 Hours Empennage Tips, Various Tasks
09/09/21 1.5 Hours HS Tip, Elevator Tip Sanding, Filling
09/08/21 1.0 Hours HS Tip Reinforcement, Elevator Tip Touchup
09/06/21 1.0 Hours HS Tip Ribs
09/05/21 1.0 Hours Elevator tips sanding & priming
09/04/21 4.5 Hours Elevator & HS tips
09/01/21 1.0 Hours Sanding Elevator Tips
08/28/21 4.5 Hours Fiberglass Elevator Tip Installation
05/29/21 0.8 Hours Misc Interior Painting
05/26/21 2.2 Hours Reassembling Interior
05/24/21 0.8 Hours Interior Painting
05/23/21 1.5 Hours Interior Painting
05/22/21 3.2 Hours Interior Painting
05/08/21 2.0 Hours Interior Painting
05/07/21 2.2 Hours Interior Paint Prep
05/05/21 1.9 Hours Interior Painting
05/04/21 1.8 Hours Interior Painting
05/01/21 5.5 Hours Air Vents, Painting Prep
04/30/21 2.0 Hours Forward Deck Deburring, Priming, Painting
04/29/21 1.5 Hours Forward Deck Deburring, Priming, Painting
04/28/21 1.6 Hours Forward Deck Prep
04/27/21 2.0 Hours Forward Deck Misc
04/26/21 3.8 Hours Forward Deck Assembly
04/25/21 3.5 Hours Forward Deck Assembly
04/24/21 5.0 Hours Cabin Frame Roll Bar Installation
04/20/21 2.0 Hours Cabin Frame Roll Bar Angles
04/19/21 1.5 Hours Cabin Frame Roll Bar Countersinking, Riveting
04/18/21 3.8 Hours Forward Deck Angle Fabrication, Drilling
04/16/21 1.2 Hours Forward Deck Angle Fab
04/15/21 2.2 Hours Cabin Frame Roll Bar Priming, Riveting
04/13/21 1.3 Hours Cabin Frame Rollbar Countersinking
04/12/21 1.2 Hours Cabin Frame Prep
04/11/21 2.8 Hours Cabin Frame Roll Bar Drilling
04/10/21 1.0 Hours Cabin Frame Misc
04/09/21 3.2 Hours More Cabin Frame Rollbar Drilling
04/08/21 2.2 Hours Cabin Frame Roll Bar Drilling
04/07/21 1.8 Hours Cabin Frame Roll Bar
04/06/21 1.8 Hours Cabin Frame Roll Bar
04/05/21 1.8 Hours Cabin Frame Roll Bar Angles
04/04/21 2.0 Hours Side Channel Covers, Cabin Frame Roll Bar
04/03/21 3.0 Hours Crotch Strap Brackets
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed. I stopped tracking times in 2024.