Date *Time Summary
10/30/21 2.0 Hours Left Wing Landing Light Lens, Misc
10/26/21 2.0 Hours Firewall Fuel Passthrough and Contactor Nutplates
10/25/21 0.8 Hours Firewall Fuel Passthrough Doubler
10/24/21 4.5 Hours Finished Boost Pump Enclosure, Plumbing
10/23/21 2.2 Hours Primed Boost Pump Cover, Prosealed NACA Ducts
10/17/21 2.5 Hours Boost Pump Kit
10/16/21 4.0 Hours Finished Battery Box
10/13/21 1.0 Hours Battery Box Fabrication
10/12/21 1.5 Hours ELT Tray Installation
10/11/21 3.2 Hours Left Wingtip Sanding, Lens
10/10/21 3.0 Hours Left Wingtip Nutplates, Dimpling
10/09/21 1.8 Hours Left Wingtip Rib, Nutplates
10/08/21 2.3 Hours Left Wingtip Drilling, Rib
10/07/21 0.5 Hours Left Wingtip, Stick Boot Rings
10/06/21 1.5 Hours Left Wingtip Install, continued
10/05/21 1.0 Hours Left Wingtip Install, continued
10/04/21 2.5 Hours Started Left Wingtip Install
10/03/21 4.5 Hours New Landing Lights, New Pitot Tube Mount
10/02/21 1.8 Hours Stick Boot Rings
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed.

Creative Commons License Unless otherwise stated, all content on this site is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 3.0 Unported License.