Date *Time Summary
10/30/21 2.0 Hours Left Wing Landing Light Lens, Misc
10/26/21 2.0 Hours Firewall Fuel Passthrough and Contactor Nutplates
10/25/21 0.8 Hours Firewall Fuel Passthrough Doubler
10/24/21 4.5 Hours Finished Boost Pump Enclosure, Plumbing
10/23/21 2.2 Hours Primed Boost Pump Cover, Prosealed NACA Ducts
10/17/21 2.5 Hours Boost Pump Kit
10/16/21 4.0 Hours Finished Battery Box
10/13/21 1.0 Hours Battery Box Fabrication
10/12/21 1.5 Hours ELT Tray Installation
10/11/21 3.2 Hours Left Wingtip Sanding, Lens
10/10/21 3.0 Hours Left Wingtip Nutplates, Dimpling
10/09/21 1.8 Hours Left Wingtip Rib, Nutplates
10/08/21 2.3 Hours Left Wingtip Drilling, Rib
10/07/21 0.5 Hours Left Wingtip, Stick Boot Rings
10/06/21 1.5 Hours Left Wingtip Install, continued
10/05/21 1.0 Hours Left Wingtip Install, continued
10/04/21 2.5 Hours Started Left Wingtip Install
10/03/21 4.5 Hours New Landing Lights, New Pitot Tube Mount
10/02/21 1.8 Hours Stick Boot Rings