Date *Time Summary
04/30/21 2.0 Hours Forward Deck Deburring, Priming, Painting
04/29/21 1.5 Hours Forward Deck Deburring, Priming, Painting
04/28/21 1.6 Hours Forward Deck Prep
04/27/21 2.0 Hours Forward Deck Misc
04/26/21 3.8 Hours Forward Deck Assembly
04/25/21 3.5 Hours Forward Deck Assembly
04/24/21 5.0 Hours Cabin Frame Roll Bar Installation
04/20/21 2.0 Hours Cabin Frame Roll Bar Angles
04/19/21 1.5 Hours Cabin Frame Roll Bar Countersinking, Riveting
04/18/21 3.8 Hours Forward Deck Angle Fabrication, Drilling
04/16/21 1.2 Hours Forward Deck Angle Fab
04/15/21 2.2 Hours Cabin Frame Roll Bar Priming, Riveting
04/13/21 1.3 Hours Cabin Frame Rollbar Countersinking
04/12/21 1.2 Hours Cabin Frame Prep
04/11/21 2.8 Hours Cabin Frame Roll Bar Drilling
04/10/21 1.0 Hours Cabin Frame Misc
04/09/21 3.2 Hours More Cabin Frame Rollbar Drilling
04/08/21 2.2 Hours Cabin Frame Roll Bar Drilling
04/07/21 1.8 Hours Cabin Frame Roll Bar
04/06/21 1.8 Hours Cabin Frame Roll Bar
04/05/21 1.8 Hours Cabin Frame Roll Bar Angles
04/04/21 2.0 Hours Side Channel Covers, Cabin Frame Roll Bar
04/03/21 3.0 Hours Crotch Strap Brackets
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed. I stopped tracking times in 2024.