Date *Time Summary
09/27/21 3.0 Hours Bolted Rudder Pedals, Installed Brake Lines, Aft Inspection Plate Covers
09/25/21 6.0 Hours Static Line Routing, Wiring Holes in F-706, Reinstalled Control Pushrod, Installed Brake Reservoir
09/24/21 4.0 Hours Misc. Priming & Riveting, Installed Static Ports
09/23/21 3.0 Hours Aileron Trim Install
09/20/21 3.5 Hours Elevator Trim, Aileron Trim
09/19/21 1.0 Hours Finished Empennage Tips (for now)
09/18/21 1.5 Hours Empennage Tip Priming
09/17/21 0.8 Hours Empennage Tips
09/16/21 2.0 Hours Empennage Tips
09/15/21 1.0 Hours Empennage Tips
09/14/21 1.3 Hours Empennage Tips
09/13/21 1.6 Hours Empennage Tips
09/12/21 3.3 Hours Empennage Tips
09/11/21 4.0 Hours Empennage Tips, Various Tasks
09/09/21 1.5 Hours HS Tip, Elevator Tip Sanding, Filling
09/08/21 1.0 Hours HS Tip Reinforcement, Elevator Tip Touchup
09/06/21 1.0 Hours HS Tip Ribs
09/05/21 1.0 Hours Elevator tips sanding & priming
09/04/21 4.5 Hours Elevator & HS tips
09/01/21 1.0 Hours Sanding Elevator Tips
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed.