12/26/22 3.6 Hours Various Left Wing Tasks
12/24/22   Built New Wing Cradle
12/21/22 2.7 Hours Aft Fuselage Bulkhead Repair
12/20/22 3.1 Hours Aft Fuselage Bulkhead Repair
12/16/22 2.0 Hours Wing Tip Forming, Seat Back Brace Re-do
12/13/22 0.5 Hours Worked on Wing Tip Deformation
12/12/22 1.0 Hours Finishing Rudder Tip, Reforming Wing Tip
12/05/22 3.0 Hours Damaged and Removed F-712 aft bulkhead, Riveted sub panel
12/04/22 1.5 Hours Empennage Fairing, Rudder Bottom Tip
11/28/22 2.1 Hours Finished Flap Sensor, Seatback Interference
11/27/22 1.2 Hours Rudder Bottom Tip Sanding & Priming
11/26/22 3.2 Hours Rudder Bottom Tip Sanding & Filling, Flap Position Sensor
11/13/22 1.1 Hours Rudder Bottom Tip Sanding & Filling
11/05/22 2.8 Hours Rudder Bottom Tip Sanding & Filling, Tail Stiffener SL, Flap Position Sensor
11/01/22 1.5 Hours Rudder Bottom Tip Sanding & Filling, Empennage Fairing Sanding
10/30/22 1.4 Hours Empennage Fairing Sanding, Rudder Bottom Tip Riveting
10/29/22 1.1 Hours Tail Light Bracket Mounting, Empennage Fairing Sanding
10/26/22 1.3 Hours Sanding & Priming Empennage Fairing
10/26/22 0.6 Hours Sanding (Empennage Fairing and Rudder Lower Tip)
10/23/22 6.5 Hours Rudder Lower Fairing, Tail Light, Antenna Installation
10/22/22 3.3 Hours Empennage Fairing Painting, Cabin Painting, Rudder Lower Fairing
10/21/22 0.6 Hours Empennage Fairing Sanding
10/20/22 1.9 Hours Empennage Fairing, Prepping for Cabin Painting
10/19/22 0.4 Hours Empennage Fairing Micro Filling
10/16/22 2.0 Hours Continued Empennage Fairing Work
10/15/22 3.9 Hours More Empennage Fairing
10/13/22 2.0 Hours Empennage Fairing Sanding, Fitting
10/12/22 2.5 Hours Empennage Fairing, Fuselage Painting
10/09/22 1.5 Hours Empennage Fairing Cutting, Sanding, Epoxy
08/15/22 1.4 Hours Canopy Handle, Painting, Empennage Fairing Sanding
08/14/22 1.4 Hours Panel Fans, Painting
08/08/22 1.5 Hours Interior Parts Painting, Empennage Fairing Sanding
08/07/22 2.3 Hours Inside Parts Painting, Empennage Fairing Sanding
07/31/22 4.2 Hours Paint Stripping
07/30/22 1.9 Hours Canopy Fans
07/17/22 2.0 Hours Paint Stripping
07/16/22 1.5 Hours Canopy Repainting
07/05/22 1.0 Hours Empennage Fairing Sanding
07/04/22 2.1 Hours Empennage Fairing Layup
07/03/22 3.2 Hours Empennage Fairing Work
07/02/22 5.1 Hours Canopy Molding Sanding, Paint Touchup, Cleaning; Started Empennage Fairing
06/23/22 0.7 Hours Canopy Molding Sanding/Touchup
06/21/22 1.2 Hours Canopy Molding Sanding/Painting
06/19/22 1.3 Hours Canopy Molding Sanding/Priming
06/16/22 2.4 Hours Canopy Molding Sanding/Filling
06/15/22 2.0 Hours Canopy Molding Sanding/Filling
06/14/22 3.1 Hours Canopy Molding Sanding
06/13/22 2.7 Hours Canopy Molding Sanding
06/11/22 3.5 Hours Laid Up the Front Canopy Molding
06/06/22 0.6 Hours Canopy Molding
06/05/22 2.8 Hours Front Canopy Molding
06/04/22 4.5 Hours Canopy Fit, Aft Window Backing Strips
05/30/22 3.2 Hours Canopy Fit
05/29/22 0.9 Hours Canopy Fit
05/22/22 2.2 Hours Canopy Handle, Fit
05/21/22 4.8 Hours Misc Riveting, Wheels Installed
05/08/22 4.4 Hours Canopy Latch Lugs, Fit
05/07/22 4.5 Hours Misc Riveting, Wheels, Canopy Assembly
05/06/22 4.4 Hours Canopy Frame Painting, Misc Fuselage Riveting, Installed Gear Legs, Started on Wheels
05/05/22 6.0 Hours Canopy Deck Riveting, Finished Canopy Frame Riveting, Canopy Struts
05/04/22 5.0 Hours Aft Top Skin Riveting
05/03/22 5.6 Hours Misc Aft Fuselage Installs, Aft Fuselage Top Skin Riveting
04/10/22 4.1 Hours Canopy Frame Priming and Riveting
04/07/22 1.5 Hours Canopy Misc
04/02/22 2.0 Hours Canopy Frame Prepping
03/31/22 1.2 Hours Canopy Frame Prepping
03/30/22 1.7 Hours Gas Strut Mounts
03/27/22 2.0 Hours More Side Skirts
03/26/22 2.7 Hours Canopy Side Skirt Fitting
03/24/22 4.4 Hours Canopy Backing Strip, Trimming, Adjusting
03/20/22 2.8 Hours Rear Window Countersinking, Fabbing Backing Strip
03/14/22 1.2 Hours Tapped Rollbar Holes, Trimmed Aft Window
03/13/22 6.0 Hours Canopy Countersinking, Drilling, Fitting
03/12/22 5.2 Hours Canopy Drilling
03/01/22 1.8 Hours Canopy Fitting
02/28/22 2.5 Hours Made the Big Canopy Cut, More Fitting
02/27/22 2.5 Hours Canopy Fitting
02/26/22 3.5 Hours Started Canopy Trimming
02/21/22 1.0 Hours Landing Gear Legs
02/19/22 2.5 Hours More Canopy Front Deck Fitting
02/18/22   Castered & Strengthened Main Fuselage Sawhorse
01/23/22 2.0 Hours Gear Leg Installation
01/17/22 3.8 Hours Canopy Misc, Engine Mount Drilling
01/13/22 1.0 Hours Canopy Misc
01/12/22 2.0 Hours Canopy Misc
01/11/22 1.5 Hours Canopy Forward Skin Shrinking
01/10/22 3.3 Hours Canopy Braces/Struts
01/09/22 2.5 Hours Canopy Reinforcement Fitting & Drilling
01/08/22 4.3 Hours Canopy Frame Drilling, Riveting
01/07/22 5.0 Hours Canopy Frame Fitting & Drilling
01/06/22 2.2 Hours Canopy Fitting
01/04/22 5.4 Hours Canopy Frame Drilling
01/03/22 7.0 Hours Canopy Frame Prep, Drilling, Fitting
01/02/22 4.0 Hours Canopy Latch Mechanism