Date *Time Summary
12/26/22 3.6 Hours Various Left Wing Tasks
12/24/22   Built New Wing Cradle
12/21/22 2.7 Hours Aft Fuselage Bulkhead Repair
12/20/22 3.1 Hours Aft Fuselage Bulkhead Repair
12/16/22 2.0 Hours Wing Tip Forming, Seat Back Brace Re-do
12/13/22 0.5 Hours Worked on Wing Tip Deformation
12/12/22 1.0 Hours Finishing Rudder Tip, Reforming Wing Tip
12/05/22 3.0 Hours Damaged and Removed F-712 aft bulkhead, Riveted sub panel
12/04/22 1.5 Hours Empennage Fairing, Rudder Bottom Tip
11/28/22 2.1 Hours Finished Flap Sensor, Seatback Interference
11/27/22 1.2 Hours Rudder Bottom Tip Sanding & Priming
11/26/22 3.2 Hours Rudder Bottom Tip Sanding & Filling, Flap Position Sensor
11/13/22 1.1 Hours Rudder Bottom Tip Sanding & Filling
11/05/22 2.8 Hours Rudder Bottom Tip Sanding & Filling, Tail Stiffener SL, Flap Position Sensor
11/01/22 1.5 Hours Rudder Bottom Tip Sanding & Filling, Empennage Fairing Sanding
10/30/22 1.4 Hours Empennage Fairing Sanding, Rudder Bottom Tip Riveting
10/29/22 1.1 Hours Tail Light Bracket Mounting, Empennage Fairing Sanding
10/26/22 1.3 Hours Sanding & Priming Empennage Fairing
10/26/22 0.6 Hours Sanding (Empennage Fairing and Rudder Lower Tip)
10/23/22 6.5 Hours Rudder Lower Fairing, Tail Light, Antenna Installation
10/22/22 3.3 Hours Empennage Fairing Painting, Cabin Painting, Rudder Lower Fairing
10/21/22 0.6 Hours Empennage Fairing Sanding
10/20/22 1.9 Hours Empennage Fairing, Prepping for Cabin Painting
10/19/22 0.4 Hours Empennage Fairing Micro Filling
10/16/22 2.0 Hours Continued Empennage Fairing Work
10/15/22 3.9 Hours More Empennage Fairing
10/13/22 2.0 Hours Empennage Fairing Sanding, Fitting
10/12/22 2.5 Hours Empennage Fairing, Fuselage Painting
10/09/22 1.5 Hours Empennage Fairing Cutting, Sanding, Epoxy
08/15/22 1.4 Hours Canopy Handle, Painting, Empennage Fairing Sanding
08/14/22 1.4 Hours Panel Fans, Painting
08/08/22 1.5 Hours Interior Parts Painting, Empennage Fairing Sanding
08/07/22 2.3 Hours Inside Parts Painting, Empennage Fairing Sanding
07/31/22 4.2 Hours Paint Stripping
07/30/22 1.9 Hours Canopy Fans
07/17/22 2.0 Hours Paint Stripping
07/16/22 1.5 Hours Canopy Repainting
07/05/22 1.0 Hours Empennage Fairing Sanding
07/04/22 2.1 Hours Empennage Fairing Layup
07/03/22 3.2 Hours Empennage Fairing Work
07/02/22 5.1 Hours Canopy Molding Sanding, Paint Touchup, Cleaning; Started Empennage Fairing
06/23/22 0.7 Hours Canopy Molding Sanding/Touchup
06/21/22 1.2 Hours Canopy Molding Sanding/Painting
06/19/22 1.3 Hours Canopy Molding Sanding/Priming
06/16/22 2.4 Hours Canopy Molding Sanding/Filling
06/15/22 2.0 Hours Canopy Molding Sanding/Filling
06/14/22 3.1 Hours Canopy Molding Sanding
06/13/22 2.7 Hours Canopy Molding Sanding
06/11/22 3.5 Hours Laid Up the Front Canopy Molding
06/06/22 0.6 Hours Canopy Molding
06/05/22 2.8 Hours Front Canopy Molding
06/04/22 4.5 Hours Canopy Fit, Aft Window Backing Strips
05/30/22 3.2 Hours Canopy Fit
05/29/22 0.9 Hours Canopy Fit
05/22/22 2.2 Hours Canopy Handle, Fit
05/21/22 4.8 Hours Misc Riveting, Wheels Installed
05/08/22 4.4 Hours Canopy Latch Lugs, Fit
05/07/22 4.5 Hours Misc Riveting, Wheels, Canopy Assembly
05/06/22 4.4 Hours Canopy Frame Painting, Misc Fuselage Riveting, Installed Gear Legs, Started on Wheels
05/05/22 6.0 Hours Canopy Deck Riveting, Finished Canopy Frame Riveting, Canopy Struts
05/04/22 5.0 Hours Aft Top Skin Riveting
05/03/22 5.6 Hours Misc Aft Fuselage Installs, Aft Fuselage Top Skin Riveting
04/10/22 4.1 Hours Canopy Frame Priming and Riveting
04/07/22 1.5 Hours Canopy Misc
04/02/22 2.0 Hours Canopy Frame Prepping
03/31/22 1.2 Hours Canopy Frame Prepping
03/30/22 1.7 Hours Gas Strut Mounts
03/27/22 2.0 Hours More Side Skirts
03/26/22 2.7 Hours Canopy Side Skirt Fitting
03/24/22 4.4 Hours Canopy Backing Strip, Trimming, Adjusting
03/20/22 2.8 Hours Rear Window Countersinking, Fabbing Backing Strip
03/14/22 1.2 Hours Tapped Rollbar Holes, Trimmed Aft Window
03/13/22 6.0 Hours Canopy Countersinking, Drilling, Fitting
03/12/22 5.2 Hours Canopy Drilling
03/01/22 1.8 Hours Canopy Fitting
02/28/22 2.5 Hours Made the Big Canopy Cut, More Fitting
02/27/22 2.5 Hours Canopy Fitting
02/26/22 3.5 Hours Started Canopy Trimming
02/21/22 1.0 Hours Landing Gear Legs
02/19/22 2.5 Hours More Canopy Front Deck Fitting
02/18/22   Castered & Strengthened Main Fuselage Sawhorse
01/23/22 2.0 Hours Gear Leg Installation
01/17/22 3.8 Hours Canopy Misc, Engine Mount Drilling
01/13/22 1.0 Hours Canopy Misc
01/12/22 2.0 Hours Canopy Misc
01/11/22 1.5 Hours Canopy Forward Skin Shrinking
01/10/22 3.3 Hours Canopy Braces/Struts
01/09/22 2.5 Hours Canopy Reinforcement Fitting & Drilling
01/08/22 4.3 Hours Canopy Frame Drilling, Riveting
01/07/22 5.0 Hours Canopy Frame Fitting & Drilling
01/06/22 2.2 Hours Canopy Fitting
01/04/22 5.4 Hours Canopy Frame Drilling
01/03/22 7.0 Hours Canopy Frame Prep, Drilling, Fitting
01/02/22 4.0 Hours Canopy Latch Mechanism
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed.

Creative Commons License Unless otherwise stated, all content on this site is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 3.0 Unported License.