Monday June 8, 2009
F-705 Prep & Prime, F-709, F-710 (Bulkheads)
2.0 Hours

Previous - Index - Next

Tonight was mainly grunt work...

I needed to prep and prime the bar stock that gets riveted to the lower part of F-705. Here is some of it drying.

While waiting for primer to dry, I deburred and fluted the F-709 bulkhead.

I also deburred the edges of the F-710 bulkhead. I need to fabricate an angle that gets attached to the upper part of this.

Most of these pieces are finished, although I need to prep and prime the other half of the long piece. I'm doing it a half at a time so I can keep track of which end is which.