Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links RSS Feed
|
Monday December 21, 2009
Tonight, it was time to start riveting. I riveted these rivets where I could squeeze them through the aileron pushrod hole. Then, I started working on these forward fuselage rivets. Here I've riveted the auxiliary longeron. Then, I riveted the F-920 bulkhead and the F-704 bulkhead to the skin down to the auxiliary stiffener. Finally, I riveted the auxiliary stiffener all the way across. I also riveted all of the same stuff on the other side of the fuselage. Then, I started carefully marking rivet lengths so that when Emily is out helping me rivet, we don't have to constantly consult the plans.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |