Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links RSS Feed
|
Saturday April 10, 2021
Today, I didn't have much time due to work, but I made 6 spacer blocks that are each 1 3/8" thick. This is the distance between the two F-631 channels when they are sandwiched together. Then I filed the other edge of the short inside strap. Next, I just need to file the long outside strap and then clamp everything together to drill the foreward channels.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |