Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links RSS Feed
|
Sunday April 25, 2021
I started assembling the subpanel and its ribs. I made these two ribs from a piece of channel per the plans. I trimmed the end of this rib per the plans. I drilled the F-768C seal support to the F-768A center subpanel, but didn't take a picture. You can see it later on. Then, I fabricated the first F-768D seal support angle. Here it is drilled to the F-768B-R outboard sub-panel. Then I made and drilled the left F-768D seal support angle. These don't look like much...but they took a lot of work to fabricate. Here's the instrument panel cleco'd to the subpanel assembly for fun.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |