Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links ![]()
|
Saturday October 15, 2022
I started today by doing a bunch more sanding of the edges to get them closer to a uniform thickness. Then, I mounted the elevators so I could make this cutout for the control arms. It took some iteration, as you can see from the previous picture to this one. And here in the full up position. I sanded the entire surface to get ready for primer. I also noticed a small damaged area on the leading edge that needed to be patched, so I did that. Finally, I drilled all of the holes out to #30 and countersunk them with a stone bit to avoid dulling my countersink bit. I still need to do some filling in the areas where I laid up new fiberglass, prime it, and install the nutplates to receive these screws on the fuse, HS, and VS.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |