Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links RSS Feed
|
Wednesday December 21, 2022
I riveted the bulkhead in place. I was able to squeeze most of them. I bucked a few inside near the bottom and used blind rivets at the very bottom. I installed the HS and VS temporarily to check the fit. Everything seems to fit perfectly. I'm so happy this job is now done. I raised the fuselage up into the rafters so we can fit a car in the garage for the next few days, which are supposed to be really cold.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |