Wednesday December 21, 2022
Aft Fuselage Bulkhead Repair (Aft Fuselage)
2.7 Hours

Previous - Index - Next

I riveted the bulkhead in place. I was able to squeeze most of them. I bucked a few inside near the bottom and used blind rivets at the very bottom.

I installed the HS and VS temporarily to check the fit.

Everything seems to fit perfectly. I'm so happy this job is now done.

I raised the fuselage up into the rafters so we can fit a car in the garage for the next few days, which are supposed to be really cold.

Previous - Index - Next