Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links RSS Feed
|
Sunday October 27, 2024
I drilled and installed the two firewall passthroughs for the mixture and prop control cables. Here's the cockpit side. And with firesleeve on the engine side. Of course, after everything was installed, I realized the prop and mixture cables were twisted in the cockpit.... so I'll have to remove one of them.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |