Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links ![]()
|
Wednesday May 14, 2025
As part of my cleanup on the pilot side, I redid most of the wires on the GAD 27 connector and then finished all of the connections to this guy. This all took a long time. By the way, I'm using zip ties everywhere to hold wire bundles together temporarily, but my plan is to replace them with wire lacing cord once everything is done. Later, I went back out to the shop and started wiring the large terminal strip on the top of the GAD 27. These are the landing light and flap motor power sources.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |