Misc Wiring
(1.0 Hours Center Fuselage, 4.0 Hours Electrical)
5.0 Hours Total

Previous - Index - Next

I stripped all of the paint off of the fuel selector valve and reprimed it. Later I painted it with the dark gray paint. Tomorrow I'll re-apply the labels and clear coat.

I soldered the ELT power/data wires to the mini DIN connector and "tested" that it was successfully receiving data.

I ran the outside temperature probe wire from the left wing stub up to the GSU 25 and closed out that connector.

Then I spent a long time cleaning up some wiring problems in the fuselage. Notably, there were a couple of wires that crossed from one side to the other under the electric fuel pump and I didn't like that, so I cut them, re-routed, and spliced them.

The wires are kind of a mess where they come down from the subpanel area to the center tunnel and I need to keep working on that tomorrow.