Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links ![]()
|
Saturday June 21, 2025
I applied the labels on the fuel selector and then applied some clear coat. Sprayed the fiberglass cut-out on the fuel selector cover with gray paint. I connected all of the wire bundles to the zip tie mounts I glued on with RTV as well as putting small zip ties in between each mount. These are very secure now. I don't think the mounts are going to fall off, either. I secured the wire bundle under the aileron trim motor with some conduit to prevent chafing. I also installed an adel clamp between the motor and the spar. I secured the wire bundle on the right side near the spar with an adel clamp. I had to move one of the screws for the terminal block on the other side of this rib to get the nut out of the way. Then I got the forward elevator pushrod into the tunnel and bolted it to the control stick assembly. I can't really do anything more with it until the elevators are installed.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |