Home Log (By Day) Log (By Category) Pictures Pics of Me Working Links ![]()
|
Wednesday June 25, 2025
I installed the 90 degree BNC connector for the ELT antenna and then installed the adel clamps to hold the cable. I replaced the low quality black tie wraps on the left side center tunnel conduit with the nice quality ones with metal tongues. I also put some more fire seal around firewall penetrations. Finally, I installed the cables for the shoulder seat belts to their mounts in the aft fuselage.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International |