Wednesday June 25, 2025
Firewall Sealing, Wire Cleanup, ELT antenna, Aft Seat Belt Anchors
(0.3 Hours Aft Fuselage, 0.8 Hours Electrical, 0.5 Hours Firewall Forward)
1.6 Hours Total

Previous - Index - Next

I installed the 90 degree BNC connector for the ELT antenna and then installed the adel clamps to hold the cable.

I replaced the low quality black tie wraps on the left side center tunnel conduit with the nice quality ones with metal tongues.

I also put some more fire seal around firewall penetrations.

Finally, I installed the cables for the shoulder seat belts to their mounts in the aft fuselage.