Monday December 18, 2006
Right Elevator Stiffeners Drilled (Right Elevator)
2.0 Hours

Previous - Index - Next

Tonight, I drilled all of the right elevator stiffeners to the right elevator skin. I drilled them right into the bench top to make sure they're as straight as can be.

Previous - Index - Next



This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International