Date |
*Time |
Summary |
12/26/22 |
3.6 Hours
|
Various Left Wing Tasks |
12/24/22 |
|
Built New Wing Cradle |
12/21/22 |
2.7 Hours
|
Aft Fuselage Bulkhead Repair |
12/20/22 |
3.1 Hours
|
Aft Fuselage Bulkhead Repair |
12/16/22 |
2.0 Hours
|
Wing Tip Forming, Seat Back Brace Re-do |
12/13/22 |
0.5 Hours
|
Worked on Wing Tip Deformation |
12/12/22 |
1.0 Hours
|
Finishing Rudder Tip, Reforming Wing Tip |
12/05/22 |
3.0 Hours
|
Damaged and Removed F-712 aft bulkhead, Riveted sub panel |
12/04/22 |
1.5 Hours
|
Empennage Fairing, Rudder Bottom Tip |
|
* Notes approximate time spent working on the plane itself. I exclude time spent
shopping, building tables and jigs, or cleaning up the shop. Accuracy of times
is not guaranteed.