| Date |
*Time |
Summary |
| 03/30/07 |
2.5 Hours
|
Drilled Z-brackets for Right Fuel Tank |
| 03/29/07 |
0.3 Hours
|
Fuel Tank Assembly |
| 03/26/07 |
0.8 Hours
|
Fuel Tank Assembly |
| 03/25/07 |
3.8 Hours
|
More Wing Assembly, Drilling |
| 03/24/07 |
5.0 Hours
|
Wing Jig, Drilling |
| 03/23/07 |
|
Wing Jig Work |
| 03/22/07 |
2.0 Hours
|
Riveted Right Wing Rear Spar |
| 03/21/07 |
2.5 Hours
|
Right Wing Riveting |
| 03/20/07 |
|
Wing Jig |
| 03/18/07 |
1.5 Hours
|
Wing Jig Construction, Rib Priming |
| 03/17/07 |
2.2 Hours
|
Wing Rib Cleaning |
| 03/16/07 |
4.5 Hours
|
Wing Rib Priming Prep |
| 03/15/07 |
3.0 Hours
|
Left Wing Drilling, Tapped Tie Downs |
| 03/14/07 |
4.0 Hours
|
Right Wing Spar/Rib Drilling, Deburring |
| 03/13/07 |
0.5 Hours
|
Stored HS, Drilled Pitot/AOA Line Holes |
| 03/12/07 |
3.0 Hours
|
Elevators Mounted to HS |
| 03/11/07 |
5.8 Hours
|
Left Elevator Leading Edge Rolling, Wing Conduit Holes |
| 03/10/07 |
4.0 Hours
|
Trim Tab Riveting |
| 03/08/07 |
2.0 Hours
|
Trim Tab Work (and Problems) |
| 03/07/07 |
4.2 Hours
|
Trim Tab Bending, Drilling, Etc |
| 03/06/07 |
4.2 Hours
|
Wing Rib Flanging and Fluting |
| 03/05/07 |
4.0 Hours
|
Wing Rib Deburring, Flanging |
| 03/04/07 |
4.4 Hours
|
Left Elevator Riveting, Trim Tab Bending, Tank Rib Deburring |
| 03/03/07 |
4.5 Hours
|
Left Elevator Tab Bending, Servo, Riveting |
| 03/02/07 |
2.5 Hours
|
Left Elevator C'Sinking, Priming |
| 03/01/07 |
3.5 Hours
|
Left Elevator Deburring, Dimpling, Misc |
|
* Notes approximate time spent working on the plane itself. I exclude time spent
shopping, building tables and jigs, or cleaning up the shop. Accuracy of times
is not guaranteed.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International   
|