| Date |
*Time |
Summary |
| 07/27/08 |
0.5 Hours
|
Left Fuel Tank Joint Plate Prep |
| 07/26/08 |
1.0 Hours
|
Wing Misc |
| 07/20/08 |
2.0 Hours
|
Left Fuel Tank Rib Riveting |
| 07/19/08 |
0.8 Hours
|
Aileron Misc |
| 07/15/08 |
1.6 Hours
|
Riveted First Left Fuel Tank Rib |
| 07/13/08 |
6.0 Hours
|
Fuel Tank Prep, Riveting/Sealing |
| 07/12/08 |
7.5 Hours
|
Fuel Tank Drilling, Prep |
| 07/11/08 |
1.8 Hours
|
Z-Bracket Drilling |
| 07/08/08 |
3.0 Hours
|
Left Wing Drilling |
| 07/07/08 |
2.8 Hours
|
Left Wing Drilling |
| 07/06/08 |
9.4 Hours
|
Flaps Finished |
| 07/05/08 |
3.8 Hours
|
More Flap Deburring, Prep |
| 07/04/08 |
3.2 Hours
|
Flap Drilling, Deburring, Priming |
| 07/03/08 |
0.8 Hours
|
Flap Prep |
| 07/02/08 |
2.0 Hours
|
Flap Drilling |
|
* Notes approximate time spent working on the plane itself. I exclude time spent
shopping, building tables and jigs, or cleaning up the shop. Accuracy of times
is not guaranteed.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International   
|