Date |
*Time |
Summary |
12/28/08 |
2.8 Hours
|
F-706 Bulkhead Work |
12/27/08 |
1.7 Hours
|
F-705, F-706 Bulkhead Work |
12/25/08 |
1.3 Hours
|
More F-705: Drilled Seatbelt Anchors |
12/21/08 |
2.0 Hours
|
F-705 Bulkhead Drilling |
12/20/08 |
7.2 Hours
|
Finished F-704 Bulkheads, Started F-705 |
12/19/08 |
1.0 Hours
|
F-704 Control Column, Nutplates |
12/17/08 |
0.5 Hours
|
Bolted Control Column to F-704 |
12/16/08 |
3.0 Hours
|
Continued F-704 Bulkhead Work |
12/15/08 |
2.0 Hours
|
Finished Firewall, Started F-704 Bulkhead |
12/14/08 |
6.7 Hours
|
Firewall Priming, Riveting |
12/13/08 |
5.2 Hours
|
Firewall Layout, Drilling |
12/12/08 |
1.5 Hours
|
Fuselage Arrives, Begin Firewall |
12/05/08 |
|
More Shop Stuff |
11/25/08 |
|
Misc Shop Stuff |
11/02/08 |
0.8 Hours
|
Installed Left Wing Conduit |
10/27/08 |
4.5 Hours
|
Left Wing Aileron Brackets, Flap Brace, Aileron Gap Fairing |
10/26/08 |
5.0 Hours
|
Pushrods, Finished Left Wing Top Skin Riveting, Demolished Wing Jig |
10/23/08 |
0.5 Hours
|
Fuel Tank De-Leaking, Misc |
10/22/08 |
1.9 Hours
|
Tank Testing, Aileron Pushrods, Top Skin Riveting |
10/22/08 |
0.7 Hours
|
Fuel Tank Testing, Pushrods |
10/13/08 |
7.0 Hours
|
Fuse Ordered, Finished Fuel Tank, Wing Prep, Pushrods |
10/12/08 |
6.5 Hours
|
Finished Both Ailerons |
10/11/08 |
10.0 Hours
|
Aileron Construction, Fuel Tank Misc |
10/10/08 |
1.0 Hours
|
Finished Rudder, Started Ailerons |
10/08/08 |
2.0 Hours
|
Riveting Inboard Fuel Tank Rib, Misc |
10/05/08 |
5.2 Hours
|
Fuel Tank Misc, Began Aileron Pushrods |
10/04/08 |
2.8 Hours
|
More Wing Prep, Fuel Tank Misc |
10/03/08 |
2.2 Hours
|
More Wing Prep |
10/02/08 |
3.9 Hours
|
Left Wing Prep |
10/01/08 |
2.0 Hours
|
Leading Edge Riveting, Wing Skeleton Prep |
08/10/08 |
2.0 Hours
|
Attached Left Leading Edge To Wing |
08/09/08 |
2.0 Hours
|
Left Landing Light |
08/08/08 |
7.5 Hours
|
Fuel Tank Rib Riveting, Rudder Rolling & Riveting, Leading Edge Riveting |
08/06/08 |
1.0 Hours
|
Left Leading Edge Prep |
07/27/08 |
0.5 Hours
|
Left Fuel Tank Joint Plate Prep |
07/26/08 |
1.0 Hours
|
Wing Misc |
07/20/08 |
2.0 Hours
|
Left Fuel Tank Rib Riveting |
07/19/08 |
0.8 Hours
|
Aileron Misc |
07/15/08 |
1.6 Hours
|
Riveted First Left Fuel Tank Rib |
07/13/08 |
6.0 Hours
|
Fuel Tank Prep, Riveting/Sealing |
07/12/08 |
7.5 Hours
|
Fuel Tank Drilling, Prep |
07/11/08 |
1.8 Hours
|
Z-Bracket Drilling |
07/08/08 |
3.0 Hours
|
Left Wing Drilling |
07/07/08 |
2.8 Hours
|
Left Wing Drilling |
07/06/08 |
9.4 Hours
|
Flaps Finished |
07/05/08 |
3.8 Hours
|
More Flap Deburring, Prep |
07/04/08 |
3.2 Hours
|
Flap Drilling, Deburring, Priming |
07/03/08 |
0.8 Hours
|
Flap Prep |
07/02/08 |
2.0 Hours
|
Flap Drilling |
06/30/08 |
3.2 Hours
|
Flaps Prep, Drilling |
06/29/08 |
8.5 Hours
|
Right Wing Aileron Gap Faring, Flap Brace, Skin Prep |
06/28/08 |
6.5 Hours
|
Wing Potpourri |
06/27/08 |
2.2 Hours
|
Left Wing Skeleton Prep |
06/26/08 |
2.0 Hours
|
Aileron Spars Deburring, Priming |
06/25/08 |
1.5 Hours
|
Aileron Bending, Skeleton Drilling |
06/24/08 |
|
Built Wing Cradle |
06/23/08 |
1.8 Hours
|
Riveted Aileron Stiffeners |
06/22/08 |
2.5 Hours
|
Aileron Deburring, Priming, Dimpling |
06/20/08 |
1.0 Hours
|
Aileron Stiffener Drilling, Deburring |
06/18/08 |
2.0 Hours
|
Aileron Stiffener Shaping, Finished Top Right Wing Skin Riveting |
06/17/08 |
1.8 Hours
|
Aileron Stiffeners, Wing Skin Riveting |
06/16/08 |
1.5 Hours
|
Wing Skin Riveting |
06/15/08 |
1.2 Hours
|
Wing Skin Riveting |
06/05/08 |
0.8 Hours
|
Wing Misc |
05/07/08 |
1.5 Hours
|
Wing Misc |
05/05/08 |
0.8 Hours
|
Top Wing Skin Prep |
05/03/08 |
0.8 Hours
|
Fuel Tank Fit, Scarf Joint |
04/27/08 |
4.8 Hours
|
Riveted Leading Edge, Misc |
04/26/08 |
2.0 Hours
|
Leading Edge |
04/22/08 |
1.4 Hours
|
Landing Light/Leading Edge |
04/20/08 |
4.8 Hours
|
Landing Light |
04/18/08 |
0.8 Hours
|
Landing Light |
04/17/08 |
2.0 Hours
|
Leading Edge |
04/15/08 |
1.0 Hours
|
Leading Edge Riveting |
04/14/08 |
1.9 Hours
|
Leading Edge Riveting |
04/13/08 |
5.0 Hours
|
Wing Prep |
04/12/08 |
2.8 Hours
|
Fuel Tank Leak Testing & Wing Prep |
04/11/08 |
6.8 Hours
|
Finished Sealing Tank |
04/10/08 |
4.6 Hours
|
Fuel Tank Sealing |
04/09/08 |
2.8 Hours
|
Fuel Tank Sealing |
04/07/08 |
|
Shop Cleanup |
04/06/08 |
4.5 Hours
|
Fuel Tank Misc |
04/05/08 |
1.5 Hours
|
Fuel Tank Misc |
04/04/08 |
6.4 Hours
|
Left Leading Edge Prep & Fuel Tank Sealing |
04/03/08 |
1.5 Hours
|
Fuel Tank Rib Sealing |
04/02/08 |
4.7 Hours
|
Fuel Tank Sealing |
04/01/08 |
1.5 Hours
|
Fuel Tank Preparation |
03/24/08 |
0.7 Hours
|
More Fuel Tank Prep |
03/23/08 |
6.0 Hours
|
Fuel Tank Prep |
03/19/08 |
1.2 Hours
|
Fuel Tank Cap & Drain |
03/16/08 |
0.5 Hours
|
Capacitive Fuel Probes |
03/14/08 |
4.2 Hours
|
Fuel Tank Details |
03/13/08 |
4.2 Hours
|
Fuel Tank Stuff |
03/12/08 |
0.8 Hours
|
Fuel Tank Drilling |
03/12/08 |
1.2 Hours
|
Fuel Tank Stiffener Fabrication |
03/10/08 |
|
Wing Reconstruction |
03/03/08 |
|
More Shop |
02/25/08 |
|
Shop Setup! |