Date |
*Time |
Summary |
09/27/20 |
3.0 Hours
|
Left Elevator Control Horn Doubler, Misc |
09/26/20 |
3.8 Hours
|
Rudder Stops, Misc Priming |
09/20/20 |
2.0 Hours
|
Seatbacks, Electric Flap Assembly, Misc Riveting |
09/19/20 |
7.0 Hours
|
Elevator Up Stop, Vertical Stabilizer Fitting, Hung Rudder |
09/18/20 |
3.0 Hours
|
Elevator Bellcrank, Pushrods |
09/17/20 |
4.2 Hours
|
Mounting Horizontal Stabilizer to the Aft Fuselage |
09/15/20 |
2.5 Hours
|
Drilled Elevator Horns |
|
* Notes approximate time spent working on the plane itself. I exclude time spent
shopping, building tables and jigs, or cleaning up the shop. Accuracy of times
is not guaranteed.
This work is licensed under Attribution-NonCommercial-NoDerivatives 4.0 International
|