Date |
*Time |
Summary |
10/30/21 |
2.0 Hours
|
Left Wing Landing Light Lens, Misc |
10/26/21 |
2.0 Hours
|
Firewall Fuel Passthrough and Contactor Nutplates |
10/25/21 |
0.8 Hours
|
Firewall Fuel Passthrough Doubler |
10/24/21 |
4.5 Hours
|
Finished Boost Pump Enclosure, Plumbing |
10/23/21 |
2.2 Hours
|
Primed Boost Pump Cover, Prosealed NACA Ducts |
10/17/21 |
2.5 Hours
|
Boost Pump Kit |
10/16/21 |
4.0 Hours
|
Finished Battery Box |
10/13/21 |
1.0 Hours
|
Battery Box Fabrication |
10/12/21 |
1.5 Hours
|
ELT Tray Installation |
10/11/21 |
3.2 Hours
|
Left Wingtip Sanding, Lens |
10/10/21 |
3.0 Hours
|
Left Wingtip Nutplates, Dimpling |
10/09/21 |
1.8 Hours
|
Left Wingtip Rib, Nutplates |
10/08/21 |
2.3 Hours
|
Left Wingtip Drilling, Rib |
10/07/21 |
0.5 Hours
|
Left Wingtip, Stick Boot Rings |
10/06/21 |
1.5 Hours
|
Left Wingtip Install, continued |
10/05/21 |
1.0 Hours
|
Left Wingtip Install, continued |
10/04/21 |
2.5 Hours
|
Started Left Wingtip Install |
10/03/21 |
4.5 Hours
|
New Landing Lights, New Pitot Tube Mount |
10/02/21 |
1.8 Hours
|
Stick Boot Rings |
|
* Notes approximate time spent working on the plane itself. I exclude time spent
shopping, building tables and jigs, or cleaning up the shop. Accuracy of times
is not guaranteed.