Date |
*Time |
Summary |
12/26/22 |
3.6 Hours
|
Various Left Wing Tasks |
12/24/22 |
|
Built New Wing Cradle |
12/21/22 |
2.7 Hours
|
Aft Fuselage Bulkhead Repair |
12/20/22 |
3.1 Hours
|
Aft Fuselage Bulkhead Repair |
12/16/22 |
2.0 Hours
|
Wing Tip Forming, Seat Back Brace Re-do |
12/13/22 |
0.5 Hours
|
Worked on Wing Tip Deformation |
12/12/22 |
1.0 Hours
|
Finishing Rudder Tip, Reforming Wing Tip |
12/05/22 |
3.0 Hours
|
Damaged and Removed F-712 aft bulkhead, Riveted sub panel |
12/04/22 |
1.5 Hours
|
Empennage Fairing, Rudder Bottom Tip |
11/28/22 |
2.1 Hours
|
Finished Flap Sensor, Seatback Interference |
11/27/22 |
1.2 Hours
|
Rudder Bottom Tip Sanding & Priming |
11/26/22 |
3.2 Hours
|
Rudder Bottom Tip Sanding & Filling, Flap Position Sensor |
11/13/22 |
1.1 Hours
|
Rudder Bottom Tip Sanding & Filling |
11/05/22 |
2.8 Hours
|
Rudder Bottom Tip Sanding & Filling, Tail Stiffener SL, Flap Position Sensor |
11/01/22 |
1.5 Hours
|
Rudder Bottom Tip Sanding & Filling, Empennage Fairing Sanding |
10/30/22 |
1.4 Hours
|
Empennage Fairing Sanding, Rudder Bottom Tip Riveting |
10/29/22 |
1.1 Hours
|
Tail Light Bracket Mounting, Empennage Fairing Sanding |
10/26/22 |
1.3 Hours
|
Sanding & Priming Empennage Fairing |
10/26/22 |
0.6 Hours
|
Sanding (Empennage Fairing and Rudder Lower Tip) |
10/23/22 |
6.5 Hours
|
Rudder Lower Fairing, Tail Light, Antenna Installation |
10/22/22 |
3.3 Hours
|
Empennage Fairing Painting, Cabin Painting, Rudder Lower Fairing |
10/21/22 |
0.6 Hours
|
Empennage Fairing Sanding |
10/20/22 |
1.9 Hours
|
Empennage Fairing, Prepping for Cabin Painting |
10/19/22 |
0.4 Hours
|
Empennage Fairing Micro Filling |
10/16/22 |
2.0 Hours
|
Continued Empennage Fairing Work |
10/15/22 |
3.9 Hours
|
More Empennage Fairing |
10/13/22 |
2.0 Hours
|
Empennage Fairing Sanding, Fitting |
10/12/22 |
2.5 Hours
|
Empennage Fairing, Fuselage Painting |
10/09/22 |
1.5 Hours
|
Empennage Fairing Cutting, Sanding, Epoxy |
08/15/22 |
1.4 Hours
|
Canopy Handle, Painting, Empennage Fairing Sanding |
08/14/22 |
1.4 Hours
|
Panel Fans, Painting |
08/08/22 |
1.5 Hours
|
Interior Parts Painting, Empennage Fairing Sanding |
08/07/22 |
2.3 Hours
|
Inside Parts Painting, Empennage Fairing Sanding |
07/31/22 |
4.2 Hours
|
Paint Stripping |
07/30/22 |
1.9 Hours
|
Canopy Fans |
07/17/22 |
2.0 Hours
|
Paint Stripping |
07/16/22 |
1.5 Hours
|
Canopy Repainting |
07/05/22 |
1.0 Hours
|
Empennage Fairing Sanding |
07/04/22 |
2.1 Hours
|
Empennage Fairing Layup |
07/03/22 |
3.2 Hours
|
Empennage Fairing Work |
07/02/22 |
5.1 Hours
|
Canopy Molding Sanding, Paint Touchup, Cleaning; Started Empennage Fairing |
06/23/22 |
0.7 Hours
|
Canopy Molding Sanding/Touchup |
06/21/22 |
1.2 Hours
|
Canopy Molding Sanding/Painting |
06/19/22 |
1.3 Hours
|
Canopy Molding Sanding/Priming |
06/16/22 |
2.4 Hours
|
Canopy Molding Sanding/Filling |
06/15/22 |
2.0 Hours
|
Canopy Molding Sanding/Filling |
06/14/22 |
3.1 Hours
|
Canopy Molding Sanding |
06/13/22 |
2.7 Hours
|
Canopy Molding Sanding |
06/11/22 |
3.5 Hours
|
Laid Up the Front Canopy Molding |
06/06/22 |
0.6 Hours
|
Canopy Molding |
06/05/22 |
2.8 Hours
|
Front Canopy Molding |
06/04/22 |
4.5 Hours
|
Canopy Fit, Aft Window Backing Strips |
05/30/22 |
3.2 Hours
|
Canopy Fit |
05/29/22 |
0.9 Hours
|
Canopy Fit |
05/22/22 |
2.2 Hours
|
Canopy Handle, Fit |
05/21/22 |
4.8 Hours
|
Misc Riveting, Wheels Installed |
05/08/22 |
4.4 Hours
|
Canopy Latch Lugs, Fit |
05/07/22 |
4.5 Hours
|
Misc Riveting, Wheels, Canopy Assembly |
05/06/22 |
4.4 Hours
|
Canopy Frame Painting, Misc Fuselage Riveting, Installed Gear Legs, Started on Wheels |
05/05/22 |
6.0 Hours
|
Canopy Deck Riveting, Finished Canopy Frame Riveting, Canopy Struts |
05/04/22 |
5.0 Hours
|
Aft Top Skin Riveting |
05/03/22 |
5.6 Hours
|
Misc Aft Fuselage Installs, Aft Fuselage Top Skin Riveting |
04/10/22 |
4.1 Hours
|
Canopy Frame Priming and Riveting |
04/07/22 |
1.5 Hours
|
Canopy Misc |
04/02/22 |
2.0 Hours
|
Canopy Frame Prepping |
03/31/22 |
1.2 Hours
|
Canopy Frame Prepping |
03/30/22 |
1.7 Hours
|
Gas Strut Mounts |
03/27/22 |
2.0 Hours
|
More Side Skirts |
03/26/22 |
2.7 Hours
|
Canopy Side Skirt Fitting |
03/24/22 |
4.4 Hours
|
Canopy Backing Strip, Trimming, Adjusting |
03/20/22 |
2.8 Hours
|
Rear Window Countersinking, Fabbing Backing Strip |
03/14/22 |
1.2 Hours
|
Tapped Rollbar Holes, Trimmed Aft Window |
03/13/22 |
6.0 Hours
|
Canopy Countersinking, Drilling, Fitting |
03/12/22 |
5.2 Hours
|
Canopy Drilling |
03/01/22 |
1.8 Hours
|
Canopy Fitting |
02/28/22 |
2.5 Hours
|
Made the Big Canopy Cut, More Fitting |
02/27/22 |
2.5 Hours
|
Canopy Fitting |
02/26/22 |
3.5 Hours
|
Started Canopy Trimming |
02/21/22 |
1.0 Hours
|
Landing Gear Legs |
02/19/22 |
2.5 Hours
|
More Canopy Front Deck Fitting |
02/18/22 |
|
Castered & Strengthened Main Fuselage Sawhorse |
01/23/22 |
2.0 Hours
|
Gear Leg Installation |
01/17/22 |
3.8 Hours
|
Canopy Misc, Engine Mount Drilling |
01/13/22 |
1.0 Hours
|
Canopy Misc |
01/12/22 |
2.0 Hours
|
Canopy Misc |
01/11/22 |
1.5 Hours
|
Canopy Forward Skin Shrinking |
01/10/22 |
3.3 Hours
|
Canopy Braces/Struts |
01/09/22 |
2.5 Hours
|
Canopy Reinforcement Fitting & Drilling |
01/08/22 |
4.3 Hours
|
Canopy Frame Drilling, Riveting |
01/07/22 |
5.0 Hours
|
Canopy Frame Fitting & Drilling |
01/06/22 |
2.2 Hours
|
Canopy Fitting |
01/04/22 |
5.4 Hours
|
Canopy Frame Drilling |
01/03/22 |
7.0 Hours
|
Canopy Frame Prep, Drilling, Fitting |
01/02/22 |
4.0 Hours
|
Canopy Latch Mechanism |