Date *Time Summary
07/17/24 1.5 Hours Oil Cooler Upper Duct Sanding and Fitting
07/16/24 2.0 Hours Oil Cooler Duct Sanding, Flange, Baffle Location
07/15/24 1.5 Hours Oil Cooler Duct Layup
07/14/24 5.0 Hours Baffle Trimming, Oil Cooler Air Ducting
07/13/24 4.0 Hours Oil Cooler Diffuser Flanges, Baffle Trimming
07/11/24 1.5 Hours Oil Cooler Diffuser Flanges, More Baffles
07/10/24 2.3 Hours Oil Cooler Diffuser Sanding
07/09/24 1.8 Hours Oil Cooler Diffuser Layup
07/08/24 2.0 Hours Oil Cooler Diffuser Layup
07/07/24 6.5 Hours Alternate Air Door, Baffles
07/06/24 3.8 Hours Sanded Diffuser, More Airbox Work
07/04/24 1.0 Hours Misc Firewall Forward
07/02/24 5.0 Hours Oil Cooler Diffuser Mold Filler/Sanding, Airbox Fitting
07/01/24 3.3 Hours Making a Oil Cooler Diffuser Mold
06/30/24 4.5 Hours Rudder Leading Edge, Airbox Mount Riveting, Oil Cooler Mount
06/26/24 4.5 Hours Rudder Prep & Riveting
06/22/24 3.0 Hours Rudder Bending/Drilling, More Baffles
06/21/24 1.0 Hours Baffles
06/20/24 4.0 Hours Air Filter Bracket, Baffles
06/19/24 0.8 Hours Airbox Fitting
06/17/24 4.0 Hours More New Rudder Work, Air Box Trimming and Fitting
06/16/24 5.3 Hours Cowl Reflective Tape, More New Rudder Work
06/15/24 4.0 Hours Baffles, Airbox, Cowl, Started New Rudder
06/11/24 2.5 Hours More Baffles
06/10/24 3.0 Hours More Baffles, Cowl Sanding
05/30/24 2.0 Hours More Baffles
05/28/24 1.0 Hours More Baffles
05/27/24 7.5 Hours Cowl Sanding, Hinges, Baffle Installation
05/26/24 3.5 Hours Cowl Fiberglass, Baffles
05/25/24 3.0 Hours More Cowl Work, Engine Misc
05/24/24 4.2 Hours Top Cowl Inlet Ducts, Oil Door
05/23/24 2.5 Hours Top Cowl Hinge Riveting, Inlet Fitting
05/19/24 2.0 Hours Cowl Sanding, Fitting
05/18/24 1.0 Hours Cowl Sanding, Fiberglass
05/17/24 1.5 Hours Cowl Sanding, Fiberglass
05/16/24 2.0 Hours New Hoses, Cowl Sanding
05/15/24 2.0 Hours Cowl Hinge Prep, Fiberglass Work
05/14/24 3.5 Hours Cowl Shifting/Drilling
05/12/24 5.0 Hours Cowl Installation
05/11/24 2.5 Hours Sniffle Valve, Installed Prop, Tensioned Alternator
05/09/24 3.0 Hours Exhaust Installation
05/08/24 2.0 Hours Engine Plumbing, Alternator
05/07/24 2.7 Hours Wheel Pant Sanding, Engine Plumbing
05/06/24 1.5 Hours Mixture Linkage, Control Cable Lengths
05/05/24 6.0 Hours Engine Prep, Hanging
05/04/24 2.5 Hours Swapped Heat Vent, Wheel Pant Prep, Opened Engine
05/02/24 2.0 Hours Propeller Arrives, Wheel Pant Priming, Avionics Layout
04/30/24 2.0 Hours Instrument Panel Assembly
04/29/24 1.0 Hours Instrument Panel Drilling, Measuring
04/28/24 3.0 Hours Instrument Panel Drilling
04/27/24 1.2 Hours Instrument Panel Prep, Wheel Pant Sanding
04/25/24 1.0 Hours Wheel Pant Sanding/Filling
04/22/24 1.5 Hours Wheel Pant Sanding
04/20/24 1.5 Hours Firewall Electrical Misc, Headset Jacks
04/19/24 1.5 Hours Firewall Forward Electrical
04/18/24 1.1 Hours Wheel Pant Sanding, Fiberglass
04/17/24 0.8 Hours Wheel Pant Bracket Riveting
04/16/24 2.0 Hours Autopilot Roll Servo Mount, VA-168 Manifold Misc, Wheel Fairing Stuff
04/15/24 1.5 Hours Cowl Attach Hinges, Wheel Pants
04/14/24 3.0 Hours Cowl Hinges
04/11/24 3.2 Hours Wheel Pant Sanding/Reinforcement, Firewall to Cowling Attach
04/10/24 0.8 Hours Right Wheel Fairing
04/09/24 1.0 Hours Left Wheel Pant
04/08/24 1.5 Hours Left Wheel Pant
04/07/24 2.0 Hours Right Wheel Fairing
04/06/24 1.0 Hours Left Wheel Fairing
04/05/24 1.5 Hours Left Wheel Fairing
04/04/24 1.2 Hours Nav Lights, Copper Bar, Wheel Fairings
03/02/24 1.3 Hours Gear Pant Centerlines, Misc
02/11/24 0.7 Hours Landing Gear Fairings
02/10/24 1.2 Hours Landing Gear Fairings
02/08/24 1.3 Hours Landing Gear Fairings
02/05/24 3.5 Hours Landing Gear Fairings
02/04/24 2.7 Hours Landing Gear Leg Fairings
02/03/24 5.0 Hours Landing Gear Leg Fairings
02/02/24 5.2 Hours Landing Gear and Leg Fairings, Brakes and Lines
* Notes approximate time spent working on the plane itself. I exclude time spent shopping, building tables and jigs, or cleaning up the shop. Accuracy of times is not guaranteed.